Amendment No. 2 for logistic support and other services to be provided by Cook Inlet Region, Incorporated/Holmes & Narver Incorporated, in connection with Susitna Hydroelectric Project, engineering and technical services feasibility studies leading to license application /
This document is an amendment to a contract between Acres American Incorporated and Cook Inlet Region, Inc./Holmes & Narver, Inc. signed June 7, 1982. Acres has entered into an agreement with the Alaska Power Authority to study the feasibility of the Susitna Hydroelectric Project, and the this a...
Saved in:
Alternate Title: | Camp operations |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Cook Inlet Region, Inc. Holmes & Narver. KNIK/ADC Joint Venture. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 3286 |
Funding Numbers: | Subcontract with KNIK/ADC Joint Venture: |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3286. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This document is an amendment to a contract between Acres American Incorporated and Cook Inlet Region, Inc./Holmes & Narver, Inc. signed June 7, 1982. Acres has entered into an agreement with the Alaska Power Authority to study the feasibility of the Susitna Hydroelectric Project, and the this amendment pertains to Acres' subcontractors. It includes a four-page subcontract called "Subcontract, Susitna Hydroelectric Project, Watana camp O/M services" between Cook Inlet Region, Incorporated/Holmes & Narver and its subcontractor KNIK/ADC Joint Venture. |
---|---|
Physical Description: | 6, [4] leaves ; 28 cm. |
Notes: | Cover title. Place of publication on cover: New York, N.Y. "May 1982." Series statement from label on cover. Stamped on cover: Susitna File Copy File # 3.25 / 21" |