Task 42, reservoir operation studies for various downstream flow requirements /

Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here.

Saved in:
Bibliographic Details
Alternate Title:Reservoir operation studies for various downstream flow requirements
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:[Harza-Ebasco Susitna Joint Venture],
Report Numbers:APA 367

APA 376
Edition:Draft.
Series:Document (Susitna Hydroelectric Project) ; no. 367.
Document (Susitna Hydroelectric Project) ; no. 376.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02394cam a2200529Ia 4500
001 2037733
003 SIRSI
005 20160524010046.0
007 ta
007 cr bn||||a||||
008 140516s1983 xx a t 000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)879902297 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 367 
088 |a APA 367 
088 |a APA 376 
049 |a RLAA 
245 0 0 |a Task 42, reservoir operation studies for various downstream flow requirements /  |c prepared by Harza-Ebasco Susitna Joint Venture for the Alaska Power Authority. 
246 3 0 |a Reservoir operation studies for various downstream flow requirements 
250 |a Draft. 
260 |a [United States] :  |b [Harza-Ebasco Susitna Joint Venture],  |c [1983] 
300 |a iv, 4, [40] pages :  |b 4 illustrations ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 367 
500 |a Chiefly tables. 
500 |a Stamped on title page: Draft. 
500 |a "October 1983." 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 367 in the Susitna Hydroelectric Project document index. Also assigned no. 376 (duplicate entry). 
530 |a Available also in electronic format on the Internet. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
520 |a Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here. 
650 0 |a Streamflow  |z Alaska  |z Susitna River  |x Computer simulation. 
610 2 0 |a Susitna Hydroelectric Project. 
650 7 |a Streamflow  |x Computer simulation.  |2 fast  |0 (OCoLC)fst01134621 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 367. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 376. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/3/APA367.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00367 
098 |a APA 00376