Task 42, reservoir operation studies for various downstream flow requirements /
Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here.
Saved in:
Alternate Title: | Reservoir operation studies for various downstream flow requirements |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | [Harza-Ebasco Susitna Joint Venture], |
Report Numbers: | APA 367 APA 376 |
Edition: | Draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 367. Document (Susitna Hydroelectric Project) ; no. 376. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here. |
---|---|
Physical Description: | iv, 4, [40] pages : 4 illustrations ; 28 cm. |
Notes: | Chiefly tables. Stamped on title page: Draft. "October 1983." Series statement from label on cover. |