Task 42, reservoir operation studies for various downstream flow requirements /

Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here.

Saved in:
Bibliographic Details
Alternate Title:Reservoir operation studies for various downstream flow requirements
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:[Harza-Ebasco Susitna Joint Venture],
Report Numbers:APA 367

APA 376
Edition:Draft.
Series:Document (Susitna Hydroelectric Project) ; no. 367.
Document (Susitna Hydroelectric Project) ; no. 376.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Effects of various downstream flow requirements on the Susitna Project energy production is assessed, and post-project flows are provided as input to the instream hydraulic studies. The data, methodology, alternatives studied, and results are documented here.
Physical Description:iv, 4, [40] pages : 4 illustrations ; 28 cm.
Notes:Chiefly tables.

Stamped on title page: Draft.

"October 1983."