Before the Federal Energy Regulatory Commission, application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate.

Saved in:
Bibliographic Details
Alternate Title:Application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate

Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate

Feasibility level estimate

Susitna Hydroelectric Project. Explanation of August 1984 revised cost estimate
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 1919

APA 1920
Series:Document (Susitna Hydroelectric Project) ; no. 1919-1920.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02549cam a2200553Ia 4500
001 2035136
003 SIRSI
005 20160425084256.0
007 ta
007 cr bn||||a||||
008 140429s1984 aku s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)878567249 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F471 no. 1919-1920 
088 |a APA 1919 
088 |a APA 1920 
049 |a RLAA 
245 0 0 |a Before the Federal Energy Regulatory Commission, application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000.  |p Feasibility level estimate. 
246 3 0 |a Application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000.  |p Feasibility level estimate 
246 3 0 |a Susitna Hydroelectric Project, Project no. 7114-000.  |p Feasibility level estimate 
246 3 0 |a Feasibility level estimate 
246 1 6 |a Susitna Hydroelectric Project.  |p Explanation of August 1984 revised cost estimate 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a 2 volumes ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 1919-1920 
500 |a Chiefly tables. 
500 |a Cover title. 
500 |a "August, 1984." 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document numbers 1919-1920 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
505 0 |a v. 1. [without special title]. (APA 1919) -- v. 2. Devil Canyon. (APA 1920). 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1919-1920. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/19/APA1919.pdf  |3 Direct link to the first volume.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/19/APA1919.html  |3 List of all volumes.  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 01919 
098 |a APA 01920