Before the Federal Energy Regulatory Commission, application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate.
Saved in:
Alternate Title: | Application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate Susitna Hydroelectric Project, Project no. 7114-000. Feasibility level estimate Feasibility level estimate Susitna Hydroelectric Project. Explanation of August 1984 revised cost estimate |
---|---|
Corporate Contributor(s): | Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. United States. Federal Energy Regulatory Commission. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1919 APA 1920 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1919-1920. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02549cam a2200553Ia 4500 | ||
---|---|---|---|
001 | 2035136 | ||
003 | SIRSI | ||
005 | 20160425084256.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140429s1984 aku s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCO |d OCLCQ |d RLA | ||
035 | |a (OCoLC)878567249 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b F471 no. 1919-1920 | |
088 | |a APA 1919 | ||
088 | |a APA 1920 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Before the Federal Energy Regulatory Commission, application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. |p Feasibility level estimate. |
246 | 3 | 0 | |a Application for license for a major project, Susitna Hydroelectric Project, Project no. 7114-000. |p Feasibility level estimate |
246 | 3 | 0 | |a Susitna Hydroelectric Project, Project no. 7114-000. |p Feasibility level estimate |
246 | 3 | 0 | |a Feasibility level estimate |
246 | 1 | 6 | |a Susitna Hydroelectric Project. |p Explanation of August 1984 revised cost estimate |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1984] | ||
300 | |a 2 volumes ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 1919-1920 | |
500 | |a Chiefly tables. | ||
500 | |a Cover title. | ||
500 | |a "August, 1984." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document numbers 1919-1920 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a v. 1. [without special title]. (APA 1919) -- v. 2. Devil Canyon. (APA 1920). | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1919-1920. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/19/APA1919.pdf |3 Direct link to the first volume. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/19/APA1919.html |3 List of all volumes. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 01919 | ||
098 | |a APA 01920 |