Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area, Study plan Section 9.15, Initial study report /
Baseline information on the harvest of resident and anadromous fishes in and downstream of the proposed Susitna-Watana Hydroelectric Project area is being compiled and analyzed to understand the potential for Project construction and operation to alter harvest levels. Baseline harvest levels for com...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 9.15, Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area. Draft. Initial Study Report. Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area (9.15) |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. R2 Resource Consultants. Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 207 |
Edition: | Draft. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 207. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03638cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 2033500 | ||
003 | SIRSI | ||
005 | 20160908182930.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 140404s2014 aku bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCF |d RLA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)875712764 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 207 sec. 9.15 | |
088 | |a SuWa 207 | ||
130 | 0 | |a Initial Study Report. |n Study plan Section 9.15, |p Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area. |s Draft. | |
245 | 1 | 0 | |a Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area, Study plan Section 9.15, Initial study report / |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. |
246 | 1 | 7 | |a Initial Study Report. |p Analysis of fish harvest in and downstream of the Susitna-Watana Hydroelectric Project area (9.15) |
250 | |a Draft. | ||
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2014] | ||
300 | |a iii, 3 pages ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207 | |
500 | |a "February 2014." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 207. | ||
513 | |a Draft Initial Study Report. | ||
510 | 3 | |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Baseline information on the harvest of resident and anadromous fishes in and downstream of the proposed Susitna-Watana Hydroelectric Project area is being compiled and analyzed to understand the potential for Project construction and operation to alter harvest levels. Baseline harvest levels for commercial, sport, personal use, and subsistence fisheries for Susitna River-origin resident and anadromous fish will be determined by compiling fish harvest statistics. Using data from other initial study report studies, this study will also evaluate the potential for harvest rates to be altered as a result of potential Project effects. This draft document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan. | ||
504 | |a Includes bibliographical reference (page 3). | ||
650 | 0 | |a Fishing |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Economic aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Economic aspects |x Research |z Alaska |z Susitna River. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Research. |
650 | 7 | |a Dams |x Economic aspects. |2 fast |0 (OCoLC)fst00887339 | |
650 | 7 | |a Fishing. |2 fast |0 (OCoLC)fst00926650 | |
650 | 7 | |a Hydroelectric power plants |x Economic aspects. |2 fast |0 (OCoLC)fst00964941 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a R2 Resource Consultants. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec9-15.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html |3 List of all draft Initial Study Reports. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 10 | ||
098 | |a SuWa 00207 |