Subtask 6.05, Development selection report.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 6.05, Development selection report

Development selection report
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

Terrestrial Environmental Specialists.
Publisher:[Alaska Power Authority],
Report Numbers:APA 1281
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1281.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03131cam a2200541Ia 4500
001 2018551
003 SIRSI
005 20140214024153.0
007 ta
007 cr bn||||a||||
008 140214s1981 akuab t s000 0 eng d
035 |a (OCoLC)870550319 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1281 
088 |a APA 1281 
245 0 0 |a Subtask 6.05, Development selection report. 
246 1 4 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Subtask 6.05,  |p Development selection report 
246 3 0 |a Development selection report 
250 |a 1st draft. 
260 |a [Anchorage, Alaska] :  |b [Alaska Power Authority],  |c [1981] 
300 |a [348] p. :  |b ill., maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "February 13, 1981." 
510 3 |a Assigned APA Document no. 1281 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
505 0 |a Introduction -- Summary -- Conclusions and recommendations -- Previous studies -- Railbelt load forecasts -- Susitna Basin studies -- Generation expansion plan -- Engineering studies -- Susitna hydroelectric development -- Appendices: B. Hydropower simulation model results -- C. Generation planning model results -- D. Task 2 status report -- E. Task 3 status report -- F. Task 4 status report -- G. Task 5 status report -- I. TES reports on environmental impacts associated with the tunnel, Watana/Devil Canyon and High Devil/Vee redevelopment plans: Preliminary environmental assessment of tunnel alternatives / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. December 15, 1980 -- Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. January 16, 1981. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Energy development  |z Alaska. 
650 0 |a Electric power consumption  |x Forecasting. 
650 0 |a Water tunnels  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Underground electric power plants  |z Alaska  |z Susitna River Valley  |x Design and construction. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Terrestrial Environmental Specialists. 
740 0 2 |a Preliminary environmental assessment of tunnel alternatives. 
740 0 2 |a Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1281. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1281.pdf  |z 36 MB.  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01281