Subtask 6.05, Development selection report.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 6.05, Development selection report

Development selection report
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

Terrestrial Environmental Specialists.
Publisher:[Alaska Power Authority],
Report Numbers:APA 1281
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1281.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary
  • Conclusions and recommendations
  • Previous studies
  • Railbelt load forecasts
  • Susitna Basin studies
  • Generation expansion plan
  • Engineering studies
  • Susitna hydroelectric development
  • Appendices: B. Hydropower simulation model results
  • C. Generation planning model results
  • D. Task 2 status report
  • E. Task 3 status report
  • F. Task 4 status report
  • G. Task 5 status report
  • I. TES reports on environmental impacts associated with the tunnel, Watana/Devil Canyon and High Devil/Vee redevelopment plans: Preliminary environmental assessment of tunnel alternatives / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. December 15, 1980
  • Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. January 16, 1981.