Subtask 6.05, Development selection report.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 6.05, Development selection report Development selection report |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Susitna Hydroelectric Project. Terrestrial Environmental Specialists. |
Publisher: | [Alaska Power Authority], |
Report Numbers: | APA 1281 |
Edition: | 1st draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1281. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Summary
- Conclusions and recommendations
- Previous studies
- Railbelt load forecasts
- Susitna Basin studies
- Generation expansion plan
- Engineering studies
- Susitna hydroelectric development
- Appendices: B. Hydropower simulation model results
- C. Generation planning model results
- D. Task 2 status report
- E. Task 3 status report
- F. Task 4 status report
- G. Task 5 status report
- I. TES reports on environmental impacts associated with the tunnel, Watana/Devil Canyon and High Devil/Vee redevelopment plans: Preliminary environmental assessment of tunnel alternatives / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. December 15, 1980
- Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. January 16, 1981.