Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report /
This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Wat...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Access road selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report Susitna Hydroelectric Project. Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads Task 2. Surveys and site facilities. Subtask 2.10, Access roads, closeout report Subtask 2.10. Access roads, closeout report Caption title on table of contents page: Access road selection, summary report |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1211 |
Edition: | 1st draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1211. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Watana and Devil Canyon dam sites. |
---|---|
Physical Description: | 135 p. in various pagings : ill., maps, forms ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "Prepared by Acres"--Cover. "December 1981." |
Bibliography: | Includes bibliographical references. |