Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report /

This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Wat...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Access road selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report

Susitna Hydroelectric Project. Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads

Task 2. Surveys and site facilities. Subtask 2.10, Access roads, closeout report

Subtask 2.10. Access roads, closeout report

Caption title on table of contents page: Access road selection, summary report
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1211
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1211.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Watana and Devil Canyon dam sites.
Physical Description:135 p. in various pagings : ill., maps, forms ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"Prepared by Acres"--Cover.

"December 1981."
Bibliography:Includes bibliographical references.