Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report /

This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Wat...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Access road selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout report

Susitna Hydroelectric Project. Access route selection report. Task 2, Surveys and site facilities. Subtask 2.10, Access roads

Task 2. Surveys and site facilities. Subtask 2.10, Access roads, closeout report

Subtask 2.10. Access roads, closeout report

Caption title on table of contents page: Access road selection, summary report
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1211
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1211.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02762cam a2200517Ia 4500
001 2018405
003 SIRSI
005 20140424024737.0
007 cr bn||||a||||
008 140212s1981 akuabk bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)870345151 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 1211 
088 |a APA 1211 
049 |a RLAA 
245 0 0 |a Access route selection report.  |n Task 2,  |p Surveys and site facilities.  |n Subtask 2.10,  |p Access roads, closeout report /  |c Acres American Incorporated. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Access road selection report.  |n Task 2,  |p Surveys and site facilities.  |n Subtask 2.10,  |p Access roads, closeout report 
246 1 4 |a Susitna Hydroelectric Project.  |p Access route selection report.  |n Task 2,  |p Surveys and site facilities.  |n Subtask 2.10,  |p Access roads 
246 3 0 |a Task 2.  |p Surveys and site facilities.  |n Subtask 2.10,  |p Access roads, closeout report 
246 3 0 |a Subtask 2.10.  |p Access roads, closeout report 
246 1 |i Caption title on table of contents page:  |a Access road selection, summary report 
250 |a 1st draft. 
260 |a [Anchorage] :  |b Alaska Power Authority,  |c [1981] 
300 |a 135 p. in various pagings :  |b ill., maps, forms ;  |c 28 cm. 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "Prepared by Acres"--Cover. 
500 |a "December 1981." 
510 3 |a Assigned APA Document no. 1211 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a This report presents the results of studies conducted to date by Acres to determine the optimum location of the access route to the proposed Susitna Hydroelectric Project. The object of Subtask 2.10 is to define alternative access routes for construction and opeation of power developments at the Watana and Devil Canyon dam sites. 
504 |a Includes bibliographical references. 
650 0 |a Highway planning  |z Alaska  |z Susitna River Region. 
650 0 |a Railroad tracks  |z Alaska  |z Susitna River Region  |x Planning. 
650 0 |a Transportation  |z Alaska  |z Susitna River Region  |x Planning. 
650 4 |a Dams  |x Access roads  |z Alaska  |z Susitna River Region. 
650 4 |a Access roads  |z Alaska  |z Susitna River Region. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1211. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1211.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01211