Technical memorandum: Adjustments to middle river focus areas /
Saved in:
Alternate Title: | Adjustments to middle river focus areas |
---|---|
Additional Author(s): | Dyok, Wayne. Bose, Kimberly D., |
Corporate Contributor(s): | Alaska Energy Authority. R2 Resource Consultants. Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | 2, iii, 43 p. : col. maps ; 28 cm. |
---|---|
Notes: | Includes cover letter to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority, dated May 31, 2013, with the subject line: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Adjustments to middle river focus areas technical memorandum. "May 2013." "Susitna-Watana Hydroelectric Project (FERC No. 14241)." ARLIS assigned report number: SuWa 200. Section 8.5b of the Final study plan. |
Report Type: | Final study plan. |
Bibliography: | Includes bibliographical references (p. 9-10). |