Technical memorandum: Adjustments to middle river focus areas /

Saved in:
Bibliographic Details
Alternate Title:Adjustments to middle river focus areas
Additional Author(s):Dyok, Wayne.

Bose, Kimberly D.,
Corporate Contributor(s):Alaska Energy Authority.

R2 Resource Consultants.

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02639cam a2200529Ia 4500
001 2015160
003 SIRSI
005 20140127103127.0
007 cr cn||||a||||
008 140127s2013 akub bt s000 0 eng d
035 |a (OCoLC)869222669 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 200 sec.8-5b 
088 |a SuWa 200 
245 0 0 |a Technical memorandum: Adjustments to middle river focus areas /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. 
246 3 0 |a Adjustments to middle river focus areas 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2013] 
300 |a 2, iii, 43 p. :  |b col. maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200 
500 |a Includes cover letter to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority, dated May 31, 2013, with the subject line: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Adjustments to middle river focus areas technical memorandum. 
500 |a "May 2013." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 200. 
513 |a Final study plan. 
510 3 |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. 
500 |a Section 8.5b of the Final study plan. 
530 |a Available also in electronic format on the Internet. 
504 |a Includes bibliographical references (p. 9-10). 
650 0 |a Geomorphology  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Freshwater habitats  |x Research  |z Alaska  |z Susitna River. 
700 1 |a Dyok, Wayne. 
700 1 |a Bose, Kimberly D.,  |e addressee. 
710 2 |a Alaska Energy Authority. 
710 2 |a R2 Resource Consultants. 
710 2 |a Susitna-Watana Hydroelectric Project. 
740 0 2 |a Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Adjustments to middle river focus areas technical memorandum. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec8-5b.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html  |3 List of related Final Study Plans.  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00200