Task 8, Transmission. Subtask 8.02, Progress report, electric system studies.
Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates.
Saved in:
Alternate Title: | Subtask 8.02, Progress report, electric system studies Progress report, electric system studies Electric system studies Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Progress report, electric system studies |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | [Alaska Power Authority], |
Report Numbers: | APA 1344 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1344. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02133cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 1991662 | ||
003 | SIRSI | ||
005 | 20131231025315.0 | ||
007 | cr bn||||a|||| | ||
008 | 131231s1981 akuab t s000 0 eng d | ||
035 | |a (OCoLC)866952517 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1344 | |
088 | |a APA 1344 | ||
245 | 0 | 0 | |a Task 8, Transmission. |n Subtask 8.02, |p Progress report, electric system studies. |
246 | 3 | 0 | |a Subtask 8.02, Progress report, electric system studies |
260 | |a [Anchorage, Alaska] : |b [Alaska Power Authority], |c [1981] | ||
246 | 3 | 0 | |a Progress report, electric system studies |
246 | 3 | 0 | |a Electric system studies |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 8, |p Transmission. |n Subtask 8.02, |p Progress report, electric system studies | |
300 | |a 34 p. in various pagings : |b ill. ; |c 28 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a computer |2 rdamedia | ||
338 | |a online resource |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "March 1981." | ||
510 | 3 | |a Assigned APA Document no. 1344 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in microfiche and electronic format on the Internet. | ||
500 | |a Cataloging based on cover lacking cover. | ||
520 | |a Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates. | ||
650 | 0 | |a Electric lines |z Alaska. | |
650 | 0 | |a Electric power transmission |z Alaska. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1344. | |
098 | |a APA 01344 | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1344.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 |