Task 8, Transmission. Subtask 8.02, Progress report, electric system studies.

Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates.

Saved in:
Bibliographic Details
Alternate Title:Subtask 8.02, Progress report, electric system studies

Progress report, electric system studies

Electric system studies

Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Progress report, electric system studies
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:[Alaska Power Authority],
Report Numbers:APA 1344
Series:Document (Susitna Hydroelectric Project) ; no. 1344.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02133cam a2200469Ia 4500
001 1991662
003 SIRSI
005 20131231025315.0
007 cr bn||||a||||
008 131231s1981 akuab t s000 0 eng d
035 |a (OCoLC)866952517 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1344 
088 |a APA 1344 
245 0 0 |a Task 8, Transmission.  |n Subtask 8.02,  |p Progress report, electric system studies. 
246 3 0 |a Subtask 8.02, Progress report, electric system studies 
260 |a [Anchorage, Alaska] :  |b [Alaska Power Authority],  |c [1981] 
246 3 0 |a Progress report, electric system studies 
246 3 0 |a Electric system studies 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 8,  |p Transmission.  |n Subtask 8.02,  |p Progress report, electric system studies 
300 |a 34 p. in various pagings :  |b ill. ;  |c 28 cm. 
336 |a text  |2 rdacontent 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "March 1981." 
510 3 |a Assigned APA Document no. 1344 in the Susitna Hydroelectric Project document index. 
530 |a Available also in microfiche and electronic format on the Internet. 
500 |a Cataloging based on cover lacking cover. 
520 |a Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates. 
650 0 |a Electric lines  |z Alaska. 
650 0 |a Electric power transmission  |z Alaska. 
610 2 0 |a Susitna Hydroelectric Project. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1344. 
098 |a APA 01344 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1344.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10