Task 8, Transmission. Subtask 8.02, Progress report, electric system studies.
Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates.
Saved in:
Alternate Title: | Subtask 8.02, Progress report, electric system studies Progress report, electric system studies Electric system studies Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Progress report, electric system studies |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | [Alaska Power Authority], |
Report Numbers: | APA 1344 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1344. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates. |
---|---|
Physical Description: | 34 p. in various pagings : ill. ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "March 1981." Cataloging based on cover lacking cover. |