Task 8, Transmission. Subtask 8.02, Progress report, electric system studies.

Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates.

Saved in:
Bibliographic Details
Alternate Title:Subtask 8.02, Progress report, electric system studies

Progress report, electric system studies

Electric system studies

Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Progress report, electric system studies
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:[Alaska Power Authority],
Report Numbers:APA 1344
Series:Document (Susitna Hydroelectric Project) ; no. 1344.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Task 8 in the Plan of Study for the Susitna Hydroelectric Project covers studies of the electrical transmission system from the Watana and Devil Canyon sites to Fairbanks and Anchorage and will be compatible to proposed interties under study by Commonwealth Associates.
Physical Description:34 p. in various pagings : ill. ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"March 1981."

Cataloging based on cover lacking cover.