Susitna Hydroelectric Project, Watana, concrete arch dam.
Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design.
Saved in:
Alternate Title: | Susitna Hydroelectric Project, Concrete dam at Watana, estimate based on scheme "2A" Title in the Susitna Hydroelectric Project document index: Project services, estimating Group 6, Watana concrete arch dam, calculations |
---|---|
Corporate Contributor(s): | Acres American Incorporated. |
Publisher: | [Acres American Incorporated], |
Report Numbers: | APA 93 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 93. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02253cam a2200457Ia 4500 | ||
---|---|---|---|
001 | 1991344 | ||
003 | SIRSI | ||
005 | 20131220031609.0 | ||
007 | cr bn||||a|||| | ||
008 | 131220s1981 nyu t 000 0 eng d | ||
035 | |a (OCoLC)865887996 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 93 | |
088 | |a APA 93 | ||
245 | 0 | 0 | |a Susitna Hydroelectric Project, Watana, concrete arch dam. |
246 | 1 | 6 | |a Susitna Hydroelectric Project, Concrete dam at Watana, estimate based on scheme "2A" |
246 | 1 | |i Title in the Susitna Hydroelectric Project document index: |a Project services, estimating Group 6, Watana concrete arch dam, calculations | |
260 | |a [Buffalo, N.Y.] : |b [Acres American Incorporated], |c [1981] | ||
300 | |a 13 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a Issued by Acres American Incorporated according to the Susitna Hydroelectric Project document index. | ||
500 | |a "October 1981." | ||
510 | 3 | |a Assigned APA Document no. 93 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Costs. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Costs. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction. | |
710 | 2 | |a Acres American Incorporated. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 93. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA93.pdf |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA93b.pdf |z Copy of cover with handwritten information (which the index compiler used for the index title). |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00093 |