Susitna Hydroelectric Project, Watana, concrete arch dam.

Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project, Concrete dam at Watana, estimate based on scheme "2A"

Title in the Susitna Hydroelectric Project document index: Project services, estimating Group 6, Watana concrete arch dam, calculations
Corporate Contributor(s):Acres American Incorporated.
Publisher:[Acres American Incorporated],
Report Numbers:APA 93
Series:Document (Susitna Hydroelectric Project) ; no. 93.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02253cam a2200457Ia 4500
001 1991344
003 SIRSI
005 20131220031609.0
007 cr bn||||a||||
008 131220s1981 nyu t 000 0 eng d
035 |a (OCoLC)865887996 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 93 
088 |a APA 93 
245 0 0 |a Susitna Hydroelectric Project, Watana, concrete arch dam. 
246 1 6 |a Susitna Hydroelectric Project, Concrete dam at Watana, estimate based on scheme "2A" 
246 1 |i Title in the Susitna Hydroelectric Project document index:  |a Project services, estimating Group 6, Watana concrete arch dam, calculations 
260 |a [Buffalo, N.Y.] :  |b [Acres American Incorporated],  |c [1981] 
300 |a 13 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Issued by Acres American Incorporated according to the Susitna Hydroelectric Project document index. 
500 |a "October 1981." 
510 3 |a Assigned APA Document no. 93 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Costs. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Costs. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction. 
710 2 |a Acres American Incorporated. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 93. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA93.pdf  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna/0/APA93b.pdf  |z Copy of cover with handwritten information (which the index compiler used for the index title).  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00093