Susitna Hydroelectric Project, Watana, concrete arch dam.

Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project, Concrete dam at Watana, estimate based on scheme "2A"

Title in the Susitna Hydroelectric Project document index: Project services, estimating Group 6, Watana concrete arch dam, calculations
Corporate Contributor(s):Acres American Incorporated.
Publisher:[Acres American Incorporated],
Report Numbers:APA 93
Series:Document (Susitna Hydroelectric Project) ; no. 93.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:Contains calculations. Pages 2-10 contain estimated costs of building the Watana dam. Pages 11-13 comprise two memoranda on dam design (reinforcing steel, stell mesh, underground rockbolts, etc.) and concrete mix design.
Physical Description:13 p. ; 28 cm.
Notes:Issued by Acres American Incorporated according to the Susitna Hydroelectric Project document index.

"October 1981."