Transmission line corridor screening. Closeout report. Task 8, Transmission.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Transmission line corridor screening. Closeout report. Task 8, Transmission Caption title on table of contents: Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.01, Closeout report. Transmission line corridor screening Task 8, Transmission |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Acres American Inc., |
Report Numbers: | APA 340 APA 1347 |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 340. Document (Susitna Hydroelectric Project) ; no. 1347. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | [117] p. : ill., maps ; 28 cm. |
---|---|
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "September 1981." Series statement from label on cover. |
Bibliography: | Includes bibliographical references. |