Susitna Hydroelectric Project, transmission line selected route final draft : figures /

The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Transmission line selected route : final draft : figures
Corporate Author: Acres American Incorporated.
Corporate Contributor(s):Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 92

APA 1349

SUS 36
Series:Document (Susitna Hydroelectric Project) ; no. 92.
Document (Susitna Hydroelectric Project) ; no. 1349.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria the best as discussed in the Transmission line corridor screening closeout report (published in 1981). For study methodology and selection criteria, see that report.
Physical Description:1 atlas ([2], 14, [1], 48 leaves) : 62 maps ; 28 x 44 cm.
Notes:Relief shown by contours.

"March 1982."
Geographic Coordinates:Scale [ca. 1:80,000] and [ca. 1:88,500] (W 150°30ʹ--W 148°30ʹ/N 65°--N 61°).