Susitna Hydroelectric Project, transmission line selected route final draft : figures /
The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria t...
Saved in:
Alternate Title: | Transmission line selected route : final draft : figures |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 92 APA 1349 SUS 36 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 92. Document (Susitna Hydroelectric Project) ; no. 1349. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria the best as discussed in the Transmission line corridor screening closeout report (published in 1981). For study methodology and selection criteria, see that report. |
---|---|
Physical Description: | 1 atlas ([2], 14, [1], 48 leaves) : 62 maps ; 28 x 44 cm. |
Notes: | Relief shown by contours. "March 1982." |
Geographic Coordinates: | Scale [ca. 1:80,000] and [ca. 1:88,500] (W 150°30ʹ--W 148°30ʹ/N 65°--N 61°). |