Air quality study.
The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and evaluate the Project's air quality effect against these standards. The analysis will evaluate both short-term (construction) and long-term (operational) e...
Saved in:
Corporate Author: | |
---|---|
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | Susitna-Watana Hydroelectric Project, |
Report Numbers: | SuWa 158 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 158. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02605cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 1989143 | ||
003 | SIRSI | ||
005 | 20131212012424.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 131211s2012 aku bt s000 0 eng d | ||
035 | |a (OCoLC)865033405 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 158 | |
088 | |a SuWa 158 | ||
110 | 2 | |a Alaska Energy Authority. | |
245 | 1 | 0 | |a Air quality study. |
260 | |a [Anchorage] : |b Susitna-Watana Hydroelectric Project, |c [2012] | ||
300 | |a 3 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 158 | |
500 | |a Title from line 1.1. | ||
500 | |a A study proposal requested by Alaska Energy Authority. | ||
500 | |a "Susitna-Watana Hydroelectric Project FERC # 14241, Alaska Energy Authority, Air quality study request 5/16/12"--Page footer. | ||
500 | |a ARLIS assigned report number: SuWa 158. | ||
513 | |a Social resources study requests. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Social resources study requests. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and evaluate the Project's air quality effect against these standards. The analysis will evaluate both short-term (construction) and long-term (operational) effects from the Project and how Project emissions compare to the no-action alternative. | ||
504 | |a Includes bibliographical references (p. 3). | ||
650 | 0 | |a Air quality |x Research |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River Watershed. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Environmental aspects |x Research. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 158. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa158.pdf |3 Direct link to this study request. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa131.html |3 List of related AEA-prepared Integrated Licensing Process study requests. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00158 |