Air quality study.

The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and evaluate the Project's air quality effect against these standards. The analysis will evaluate both short-term (construction) and long-term (operational) e...

Full description

Saved in:
Bibliographic Details
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:Susitna-Watana Hydroelectric Project,
Report Numbers:SuWa 158
Series:Susitna-Watana Hydroelectric Project document ; no. 158.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and evaluate the Project's air quality effect against these standards. The analysis will evaluate both short-term (construction) and long-term (operational) effects from the Project and how Project emissions compare to the no-action alternative.
Physical Description:3 p. ; 28 cm.
Notes:Title from line 1.1.

A study proposal requested by Alaska Energy Authority.

"Susitna-Watana Hydroelectric Project FERC # 14241, Alaska Energy Authority, Air quality study request 5/16/12"--Page footer.

ARLIS assigned report number: SuWa 158.
Report Type:Social resources study requests.
Bibliography:Includes bibliographical references (p. 3).