Watana Project, briefing document on RCC considerations.
For the Watana Dam on the Susitna River, the option of a roller-compacted concrete (RCC) dam has been suggested for consideration. This memo, requested by Alaska Energy Authority, addresses some of the more pertinent aspects of the choice of an RCC option, including precedence, seismic performance,...
Saved in:
Alternate Title: | Watana Project, briefing document on roller-compacted concrete considerations Railbelt large hydro |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. MWH Americas, Inc. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 109 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 109. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | For the Watana Dam on the Susitna River, the option of a roller-compacted concrete (RCC) dam has been suggested for consideration. This memo, requested by Alaska Energy Authority, addresses some of the more pertinent aspects of the choice of an RCC option, including precedence, seismic performance, spillway, and project layout. Other matters of relevance that have not been explored in this memo, but which will influence the choice of the dam type include the availability of aggregate on site for RCC production, availability of cementitious materials (cement and pozzolan), thermal considerations, and schedule comparisons. |
---|---|
Physical Description: | [6] p. ; 28 cm. |
Notes: | Title from caption. "Alaska Energy Authority"--Page header. "MWH Americas Inc."--Page footer. "2/15/2011"--Page footer. ARLIS assigned report number: SuWa 109. |
Report Type: | Briefing and technical documents. |