Alaska Energy Authority response to National Marine Fisheries Service and U.S. Fish and Wildlife Service February 5, 2013 interim comments on the characterization and mapping of aquatic habitats revised study plan (RSP Section 9.9).
On February 5, 2013, National Marine Fisheries Service and U.S. Fish and Wildlife Service filed with the Federal Energy Regulatory Commission interim comments on the Characterization and Mapping of Aquatic Habitats Revised Study Plan (RSP Section 9.9). Through this document, Alaska Energy Authority...
Saved in:
Alternate Title: | Response on comments to habitat mapping Attachment E, Response to interim comments on characterizations and mapping of aquatic habitat mapping revised study plan (RSP 9.9) |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 21 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 21. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03074cam a2200505Ia 4500 | ||
---|---|---|---|
001 | 1977145 | ||
003 | SIRSI | ||
005 | 20131004112941.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 131004s2013 aku s000 0 eng d | ||
035 | |a (OCoLC)859409284 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 21 | |
088 | |a SuWa 21 | ||
110 | 2 | |a Alaska Energy Authority. | |
245 | 1 | 0 | |a Alaska Energy Authority response to National Marine Fisheries Service and U.S. Fish and Wildlife Service February 5, 2013 interim comments on the characterization and mapping of aquatic habitats revised study plan (RSP Section 9.9). |
246 | 1 | 7 | |a Response on comments to habitat mapping |
246 | 1 | 4 | |a Attachment E, Response to interim comments on characterizations and mapping of aquatic habitat mapping revised study plan (RSP 9.9) |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a 5, 3 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 21 | |
500 | |a Title from caption. | ||
500 | |a ARLIS assigned report number: SuWa 21. | ||
500 | |a This document is an attachment to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; submittal of information related to study plan determination (SuWa 16). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a On February 5, 2013, National Marine Fisheries Service and U.S. Fish and Wildlife Service filed with the Federal Energy Regulatory Commission interim comments on the Characterization and Mapping of Aquatic Habitats Revised Study Plan (RSP Section 9.9). Through this document, Alaska Energy Authority responds to these interim comments. | ||
505 | 0 | |a Response letter -- Attachment 1. A comparison of habitat mapping classifications and measured parameters between NMFS and USFWS (Services) 02/03/2013 interim comments and AEA RSP Section 9.9 characterization and mapping of aquatic habitats. | |
650 | 0 | |a Freshwater habitats |z Alaska |z Susitna River. | |
650 | 0 | |a Stream mapping |z Alaska |z Susitna River. | |
650 | 0 | |a Ecological mapping |z Alaska |z Susitna River. | |
610 | 1 | 0 | |a United States. |b National Marine Fisheries Service. |
610 | 2 | 0 | |a U.S. Fish and Wildlife Service. |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
787 | 0 | 8 | |i Attachment to: |a Dyok, Wayne. |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; submittal of information related to study plan determination. |d [Anchorage : Alaska Energy Authority, 2013] |w (OCoLC)859355490 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 21. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa21.pdf |3 Direct link to report. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa16.html |3 List of all reports filed under the cover letter of March 1, 2013. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00021 |