Alaska Energy Authority response to National Marine Fisheries Service and U.S. Fish and Wildlife Service February 5, 2013 interim comments on the characterization and mapping of aquatic habitats revised study plan (RSP Section 9.9).

On February 5, 2013, National Marine Fisheries Service and U.S. Fish and Wildlife Service filed with the Federal Energy Regulatory Commission interim comments on the Characterization and Mapping of Aquatic Habitats Revised Study Plan (RSP Section 9.9). Through this document, Alaska Energy Authority...

Full description

Saved in:
Bibliographic Details
Alternate Title:Response on comments to habitat mapping

Attachment E, Response to interim comments on characterizations and mapping of aquatic habitat mapping revised study plan (RSP 9.9)
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 21
Series:Susitna-Watana Hydroelectric Project document ; no. 21.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:On February 5, 2013, National Marine Fisheries Service and U.S. Fish and Wildlife Service filed with the Federal Energy Regulatory Commission interim comments on the Characterization and Mapping of Aquatic Habitats Revised Study Plan (RSP Section 9.9). Through this document, Alaska Energy Authority responds to these interim comments.
Physical Description:5, 3 p. ; 28 cm.
Notes:Title from caption.

ARLIS assigned report number: SuWa 21.

This document is an attachment to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; submittal of information related to study plan determination (SuWa 16).
Related Titles:Attachment to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; submittal of information related to study plan determination. [Anchorage : Alaska Energy Authority, 2013]