Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments /
The overall objective of this study is to make preliminary estimates of the overall sediment balance in the middle and lower river segments under pre-project conditions and the potential magnitude of the changes that will occur under maximum load following OS-1 hydrologic conditions, including the s...
Saved in:
Alternate Title: | Copy for the March 01, 2013 filing (SuWa 14) has cover title: Attachment H, Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments (February 2013) Sediment-transport relationships/sediment balance |
---|---|
Corporate Contributor(s): | Tetra Tech, Inc. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 14 SuWa 50 SuWa 51 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 14. Susitna-Watana Hydroelectric Project document ; no. 50-51. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Summary
- Study objectives
- Study area and available data
- Methods
- Results
- Discussion and conclusions
- Tables
- Figures
- appendix A. Sediment-transport data and regression summary
- appendix B.1. Annual sediment load tabular summary for pre-project conditions
- appendix B.2. Annual sediment load tabular summary for maximum load following operations Scenario 1.