Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments /

The overall objective of this study is to make preliminary estimates of the overall sediment balance in the middle and lower river segments under pre-project conditions and the potential magnitude of the changes that will occur under maximum load following OS-1 hydrologic conditions, including the s...

Full description

Saved in:
Bibliographic Details
Alternate Title:Copy for the March 01, 2013 filing (SuWa 14) has cover title: Attachment H, Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments (February 2013)

Sediment-transport relationships/sediment balance
Corporate Contributor(s):Tetra Tech, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 14

SuWa 50

SuWa 51
Series:Susitna-Watana Hydroelectric Project document ; no. 14.
Susitna-Watana Hydroelectric Project document ; no. 50-51.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Summary
  • Study objectives
  • Study area and available data
  • Methods
  • Results
  • Discussion and conclusions
  • Tables
  • Figures
  • appendix A. Sediment-transport data and regression summary
  • appendix B.1. Annual sediment load tabular summary for pre-project conditions
  • appendix B.2. Annual sediment load tabular summary for maximum load following operations Scenario 1.