Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments /

The overall objective of this study is to make preliminary estimates of the overall sediment balance in the middle and lower river segments under pre-project conditions and the potential magnitude of the changes that will occur under maximum load following OS-1 hydrologic conditions, including the s...

Full description

Saved in:
Bibliographic Details
Alternate Title:Copy for the March 01, 2013 filing (SuWa 14) has cover title: Attachment H, Development of sediment-transport relationships and an initial sediment balance for the middle and lower Susitna River segments (February 2013)

Sediment-transport relationships/sediment balance
Corporate Contributor(s):Tetra Tech, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 14

SuWa 50

SuWa 51
Series:Susitna-Watana Hydroelectric Project document ; no. 14.
Susitna-Watana Hydroelectric Project document ; no. 50-51.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The overall objective of this study is to make preliminary estimates of the overall sediment balance in the middle and lower river segments under pre-project conditions and the potential magnitude of the changes that will occur under maximum load following OS-1 hydrologic conditions, including the specific assessments of the following, interrelated topics: (1) determination of the suitability of previously published sediment transport relationships between discharge and sediment load and update the relationships if necessary; (2) selection of the most appropriate sediment transport relationships for use in the preliminary sediment balance; (3) use the selected sediment transport relationships to estimate the pre-project and maximum load following OS-1 annual loads. The sediment loads will be divided into wash load (silt and clay), sand load and gravel load; (4) comparison of estimated annual sediment loads at the three mainstem Susitna River gages to characterize the overall sediment balance under pre-project conditions and the potential changes under maximum load following OS-1 conditions.
Physical Description:v, 39, 45 p. : 1 col. map, col. charts ; 28 cm.
Notes:At head of title: Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"February 2013."

ARLIS assigned report number: SuWa 14 (for the March 01, 2013 filing category).

ARLIS assigned report numbers: SuWa 50 (main report) and SuWa 51 (appendices) (for the 2012 environmental studies category).

The document SuWa 14 is an attachment to: Susitna-Watana Hydroelectric Project, FERC project no. 14241-000; filing of 2012 baseline environmental and resources study reports (SuWa 6).
Report Type:March 01, 2013 filing.

2012 environmental studies.
Related Titles:Attachment to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC project no. 14241-000; filing of 2012 baseline environmental and resources study reports. [Anchorage : Alaska Energy Authority, 2013]
Bibliography:Includes bibliographical references (p. 14-15).