Report on meetings /

This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic inv...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska : report on meetings

Report on meetings
Corporate Author: Susitna Hydroelectric Project. Specialist Consultants Panel. Meeting (1st : 1980 : Anchorage, Alaska)
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.
Publisher:Acres American Inc.,
Report Numbers:APA 2349
Series:Document (Susitna Hydroelectric Project) ; no. 2349.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02681cam a2200529Ia 4500
001 1735724
003 SIRSI
005 20140214035301.0
007 cr bn||||a||||
008 030603s1980 nyuabe 100 0 eng d
035 |a (OCoLC)52364462 
040 |a ALK  |c ALK  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S9  |b A379 1980 
050 4 |a TK1425.S8  |b A23 no. 2349 
088 |a APA 2349 
110 2 |a Susitna Hydroelectric Project.  |b Specialist Consultants Panel.  |b Meeting  |n (1st :  |d 1980 :  |c Anchorage, Alaska) 
245 1 0 |a Report on meetings /  |c First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska. 
246 3 |a Susitna Hydroelectric Project.  |p First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska :  |b report on meetings 
246 3 0 |a Report on meetings 
260 |a Buffalo, N.Y. :  |b Acres American Inc.,  |c [1980] 
300 |a 1 v. (various foliations) :  |b ill., maps, plans ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 2349 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 2349 in the Susitna Hydroelectric Project document index. 
610 2 0 |a Devil Canyon Project  |v Congresses. 
530 |a Available also in electronic format on the Internet. 
520 |a This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic investigations and preliminary design studies for the Devil Canyon dam and the Watana rockfill dam. 
610 2 0 |a Susitna Hydroelectric Project  |v Congresses. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |v Congresses. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
596 |a 9 10 23 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2349. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/23/APA2349.pdf  |z ARLIS Document Server 
901 |a 3755  |c arlis 201402 
043 |a n-us-ak 
977 |a o52364462 
098 |a APA 02349