Report on meetings /
This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic inv...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska : report on meetings Report on meetings |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. |
Publisher: | Acres American Inc., |
Report Numbers: | APA 2349 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2349. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02681cam a2200529Ia 4500 | ||
---|---|---|---|
001 | 1735724 | ||
003 | SIRSI | ||
005 | 20140214035301.0 | ||
007 | cr bn||||a|||| | ||
008 | 030603s1980 nyuabe 100 0 eng d | ||
035 | |a (OCoLC)52364462 | ||
040 | |a ALK |c ALK |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S9 |b A379 1980 | |
050 | 4 | |a TK1425.S8 |b A23 no. 2349 | |
088 | |a APA 2349 | ||
110 | 2 | |a Susitna Hydroelectric Project. |b Specialist Consultants Panel. |b Meeting |n (1st : |d 1980 : |c Anchorage, Alaska) | |
245 | 1 | 0 | |a Report on meetings / |c First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska. |
246 | 3 | |a Susitna Hydroelectric Project. |p First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska : |b report on meetings | |
246 | 3 | 0 | |a Report on meetings |
260 | |a Buffalo, N.Y. : |b Acres American Inc., |c [1980] | ||
300 | |a 1 v. (various foliations) : |b ill., maps, plans ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 2349 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 2349 in the Susitna Hydroelectric Project document index. | |
610 | 2 | 0 | |a Devil Canyon Project |v Congresses. |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic investigations and preliminary design studies for the Devil Canyon dam and the Watana rockfill dam. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |v Congresses. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |v Congresses. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
596 | |a 9 10 23 | ||
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2349. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/23/APA2349.pdf |z ARLIS Document Server |
901 | |a 3755 |c arlis 201402 | ||
043 | |a n-us-ak | ||
977 | |a o52364462 | ||
098 | |a APA 02349 |