Report on meetings /
This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic inv...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska : report on meetings Report on meetings |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. |
Publisher: | Acres American Inc., |
Report Numbers: | APA 2349 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2349. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic investigations and preliminary design studies for the Devil Canyon dam and the Watana rockfill dam. |
---|---|
Physical Description: | 1 v. (various foliations) : ill., maps, plans ; 28 cm. |
Notes: | At head of title: Susitna Hydroelectric Project. Series statement from label on cover. |