Report on meetings /

This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic inv...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. First Specialist Consultants Panel Meeting, October 21 through 23, 1980, Anchorage, Alaska : report on meetings

Report on meetings
Corporate Author: Susitna Hydroelectric Project. Specialist Consultants Panel. Meeting (1st : 1980 : Anchorage, Alaska)
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.
Publisher:Acres American Inc.,
Report Numbers:APA 2349
Series:Document (Susitna Hydroelectric Project) ; no. 2349.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feasibility studies being undertaken by Acres; to review geological, geotechnical, and seismic information; and to discuss planned geotechnical and seismic investigations and preliminary design studies for the Devil Canyon dam and the Watana rockfill dam.
Physical Description:1 v. (various foliations) : ill., maps, plans ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

Series statement from label on cover.