Susitna Hydroelectric Project feasibility report /
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost estimates, and an economic and financial evaluation for the Susitna Hydroelectric Project in Alaska, and to assess the environmental impact of the project...
Saved in:
Alternate Title: | Feasibility report Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Terrestrial Environmental Specialists. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 95 APA 169 APA 174 APA 175 APA 176 APA 177 APA 178 APA 179 APA 180 APA 181 APA 182 APA 1414 APA 1415 APA 1416 APA 1417 APA 1418 APA 1419 APA 1420 APA 1421 APA 1422 SUS 38 |
Original Source: | Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 95. Document (Susitna Hydroelectric Project) ; no. 169. Document (Susitna Hydroelectric Project) ; no. 174-182. Document (Susitna Hydroelectric Project) ; no. 1414-1422. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 07680cam a2201333Ia 4500 | ||
---|---|---|---|
001 | 1556289 | ||
003 | SIRSI | ||
005 | 20160519095253.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 020517s1982 akuab st s000 0 eng d | ||
040 | |a ALK |b eng |c ALK |d RLA |d UAB |d RLA |d OCLCF |d RLA |d OCLCQ |d OCL |d RLA | ||
019 | |a 70525368 | ||
035 | |a (OCoLC)49820541 |z (OCoLC)70525368 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 174-182 | |
088 | |a APA 95 | ||
088 | |a APA 169 | ||
088 | |a APA 174 | ||
088 | |a APA 175 | ||
088 | |a APA 176 | ||
088 | |a APA 177 | ||
088 | |a APA 178 | ||
088 | |a APA 179 | ||
088 | |a APA 180 | ||
088 | |a APA 181 | ||
088 | |a APA 182 | ||
088 | |a APA 1414 | ||
088 | |a APA 1415 | ||
088 | |a APA 1416 | ||
088 | |a APA 1417 | ||
088 | |a APA 1418 | ||
088 | |a APA 1419 | ||
088 | |a APA 1420 | ||
088 | |a APA 1421 | ||
088 | |a APA 1422 | ||
088 | |a SUS 38 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Susitna Hydroelectric Project feasibility report / |c prepared by Acres. |
246 | 3 | 0 | |a Feasibility report |
250 | |a Final draft. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 7 volumes in 9 : |b illustrations, maps ; |c 28-28 x 44 cm | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "Volume 2 prepared by Terrestrial Environmental Specialists, Inc. for Acres." | ||
500 | |a "The feasibility study was undertaken in accordance with the Plan of Study (POS) for the Susitna Hydroelectric Project, which was first issued by the Power Authority for public review and comment on February 4, 1980. Three revisions to the POS were issued in September, 1980, December, 1981, and January, 1982 to take account of public, federal, and state agency comments and concerns. ... The POS also addresses the requirements for filing a FERC license application, which is currently scheduled for September 30, 1982"--Volume 1, sections 1-8, page 1-1. | ||
500 | |a The Susitna Hydroelectric Project document index gives the date "830504" [i.e. May 4, 1983], but the text suggests a date 1982. The supplement to the feasibility report states the report was issed March 15, 1982 (see Section 1.1). | ||
530 | |a Available also in electronic format on the Internet. | ||
510 | 3 | |a Assigned APA Document numbers 174-182 in the Susitna Hydroelectric Project document index. Also assigned numbers 95, 169, and 1414-1422 (duplicate entries). | |
510 | 3 | |a Assigned number SUS 38 in the Susitna Aquatic Impact Assessment Project bibliography. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
500 | |a Volume 7 contains three issues of "The Susitna hydro studies" in pocket: 1st-3rd (November 1980-January 1982). Exhibit 3 of volume 7 includes a copy of: A report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives : April 1980, Fairbanks, Talkeetna, Wasilla, Anchorage. | ||
505 | 0 | 0 | |g v. 1, sec. 1-8. |t Engineering and economic aspects. |g (APA 174 or APA 1414) -- v. 1, sec. 9-19. |t Engineering and economic aspects. |g (APA 175 or APA 169 or APA 1415) -- v. 2, sec. 1-4. |t Environmental report. |g (APA 176 or APA 1416) -- v. 2, sec. 5-11. |t Environmental report. |g (APA 177 or APA 1417) -- v. 3. |t Plates. |g (APA 178 or APA 1418) -- v. 4. appendix A. |t Hydrological studies. |g (APA 179 or APA 1419) -- v. 5. appendix B. |t Design development studies. |g (APA 180 or APA 1420) -- v. 6. appendix C. |t Cost estimates. |g (APA 181 or 95 or APA 1421) -- v. 7. appendix D. |t Coordination and public participation. |g (APA 182 or APA 1422). |
520 | |a A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost estimates, and an economic and financial evaluation for the Susitna Hydroelectric Project in Alaska, and to assess the environmental impact of the project and appropriate mitigation measures. | ||
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Planning. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Planning. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Planning. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Dams |x Planning |2 fast |0 (OCoLC)fst00887365 | |
650 | 7 | |a Hydroelectric power plants |x Planning. |2 fast |0 (OCoLC)fst00964961 | |
650 | 7 | |a Planning. |2 fast |0 (OCoLC)fst01065224 | |
650 | 7 | |a Water-power |x Planning. |2 fast |0 (OCoLC)fst01355318 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
653 | 0 | |a Water Pollution, Effects on Fauna | |
653 | 0 | |a Electric Power, Generation or Supply of | |
653 | 0 | |a Alaska, Southcentral | |
653 | 0 | |a Hydraulic Energy, Uses | |
653 | 0 | |a Electricity, Generation or Supply of | |
653 | 0 | |a Water Power | |
653 | 0 | |a Alaska, Southwest | |
653 | 0 | |a Water Pollution, Effects on Flora | |
653 | 0 | |a Water Pollution | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Terrestrial Environmental Specialists. | |
730 | 0 | 2 | |a Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |
770 | 0 | |t Susitna Hydroelectric Project. Draft supplement to the feasibility report. |d [Anchorage, Alaska] : Alaska Power Authority, [1983] |r APA 614 |w (OCoLC)889526779 | |
770 | 0 | |t Susitna Hydroelectric Project feasibility report. Supplement. |b [Final]. |d [Anchorage, Alaska] : Alaska Power Authority, [1983] |r APA 504-505 |w (OCoLC)11671715 | |
770 | 0 | |t Feasibility report, comprehensive bibliography. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |r APA 3315 |w (OCoLC)887907914 | |
787 | 0 | 8 | |i Evaluated in (work): |t Review and testimonies on Acres feasibility report. |d Buffalo, N.Y. : Acres American Incorporated, [1982] |r APA 1293 |w (OCoLC)888053595 |
787 | 0 | 8 | |i Replacement of (work): |t Feasibility report. Volume 1, Engineering and economic aspects. |b 1st draft. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |n "February, 1982." |r APA 1291-1292 |w (OCoLC)869298757 |
787 | 0 | 8 | |i Replaced in part by (work): |t Feasibility report. Volume 6, Appendix C, Cost estimates, Final draft, November 1982 revisions. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |r APA 1423 |w (OCoLC)887916310 |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 95. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 169. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 174-182. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1414-1422. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA174.pdf |3 Direct link to the first volume (Sections 1-8. Engineering and economic aspects). |z ARLIS Document Server |
977 | |a o49820541 | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA174.html |3 List of all volumes of this feasibility report and a list of related documents. |z ARLIS Document Server |
901 | |a 0104 |c TK1424.A4 S974 | ||
596 | |a 9 10 11 13 23 24 | ||
098 | |a APA 00095 | ||
098 | |a SUS 00038 | ||
098 | |a APA 00169 | ||
098 | |a APA 00174 | ||
098 | |a APA 00175 | ||
098 | |a APA 00176 | ||
098 | |a APA 00177 | ||
098 | |a APA 00178 | ||
098 | |a APA 00179 | ||
098 | |a APA 00180 | ||
098 | |a APA 00181 | ||
098 | |a APA 00182 | ||
098 | |a APA 01414 | ||
098 | |a APA 01415 | ||
098 | |a APA 01416 | ||
098 | |a APA 01417 | ||
098 | |a APA 01418 | ||
098 | |a APA 01419 | ||
098 | |a APA 01420 | ||
098 | |a APA 01421 | ||
098 | |a APA 01422 |