Susitna Hydroelectric Project feasibility report /
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost estimates, and an economic and financial evaluation for the Susitna Hydroelectric Project in Alaska, and to assess the environmental impact of the project...
Saved in:
Alternate Title: | Feasibility report Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Terrestrial Environmental Specialists. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 95 APA 169 APA 174 APA 175 APA 176 APA 177 APA 178 APA 179 APA 180 APA 181 APA 182 APA 1414 APA 1415 APA 1416 APA 1417 APA 1418 APA 1419 APA 1420 APA 1421 APA 1422 SUS 38 |
Original Source: | Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 95. Document (Susitna Hydroelectric Project) ; no. 169. Document (Susitna Hydroelectric Project) ; no. 174-182. Document (Susitna Hydroelectric Project) ; no. 1414-1422. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost estimates, and an economic and financial evaluation for the Susitna Hydroelectric Project in Alaska, and to assess the environmental impact of the project and appropriate mitigation measures. |
---|---|
Physical Description: | 7 volumes in 9 : illustrations, maps ; 28-28 x 44 cm |
Notes: | "Volume 2 prepared by Terrestrial Environmental Specialists, Inc. for Acres." "The feasibility study was undertaken in accordance with the Plan of Study (POS) for the Susitna Hydroelectric Project, which was first issued by the Power Authority for public review and comment on February 4, 1980. Three revisions to the POS were issued in September, 1980, December, 1981, and January, 1982 to take account of public, federal, and state agency comments and concerns. ... The POS also addresses the requirements for filing a FERC license application, which is currently scheduled for September 30, 1982"--Volume 1, sections 1-8, page 1-1. The Susitna Hydroelectric Project document index gives the date "830504" [i.e. May 4, 1983], but the text suggests a date 1982. The supplement to the feasibility report states the report was issed March 15, 1982 (see Section 1.1). Volume 7 contains three issues of "The Susitna hydro studies" in pocket: 1st-3rd (November 1980-January 1982). Exhibit 3 of volume 7 includes a copy of: A report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives : April 1980, Fairbanks, Talkeetna, Wasilla, Anchorage. |
Related Titles: | Evaluated in (work): Review and testimonies on Acres feasibility report. Buffalo, N.Y. : Acres American Incorporated, [1982] APA 1293 Replacement of (work): Feasibility report. Volume 1, Engineering and economic aspects. 1st draft. [Anchorage, Alaska] : Alaska Power Authority, [1982] "February, 1982." APA 1291-1292 Replaced in part by (work): Feasibility report. Volume 6, Appendix C, Cost estimates, Final draft, November 1982 revisions. [Anchorage, Alaska] : Alaska Power Authority, [1982] APA 1423 |
Original Source: | Report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives. |