Susitna RCC dam cost evaluation : final /

For the Devil Canyon Dam and Watana Dam on the Susitna River, the option of roller-compacted concrete (RCC) dams have been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for RCC dams at these sites.

Saved in:
Bibliographic Details
Alternate Title:Susitna roller compacted concrete dam cost evaluation : final

Susitna Project Watana and High Devil Canyon RCC dam cost evaluation : final

Susitna Project Watana and High Devil Canyon roller compacted concrete dam cost evaluation : final

AEA - Sustina RCC dam cost evaluation
Corporate Contributor(s):R & M Consultants.

Hatch Acres (Firm)

Jack Linard Consulting.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 197
Series:Susitna-Watana Hydroelectric Project document ; no. 197.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Executive summary
  • Introduction
  • Project description
  • General setting
  • Watana site
  • High Devil Canyon site
  • Roller compacted concrete
  • Construction costs
  • Project timeline for licensing and construction
  • List of references
  • Closure
  • Figures
  • appendix A. Property ownership table
  • appendix B. Cost estimate summary table
  • appendix C. Cost estimate detail : full Watana RCC
  • appendix D. Cost estimate detail : High Devil Canyon RCC.