Susitna RCC dam cost evaluation : final /
For the Devil Canyon Dam and Watana Dam on the Susitna River, the option of roller-compacted concrete (RCC) dams have been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for RCC dams at these sites.
Saved in:
Alternate Title: | Susitna roller compacted concrete dam cost evaluation : final Susitna Project Watana and High Devil Canyon RCC dam cost evaluation : final Susitna Project Watana and High Devil Canyon roller compacted concrete dam cost evaluation : final AEA - Sustina RCC dam cost evaluation |
---|---|
Corporate Contributor(s): | R & M Consultants. Hatch Acres (Firm) Jack Linard Consulting. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 197 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 197. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Executive summary
- Introduction
- Project description
- General setting
- Watana site
- High Devil Canyon site
- Roller compacted concrete
- Construction costs
- Project timeline for licensing and construction
- List of references
- Closure
- Figures
- appendix A. Property ownership table
- appendix B. Cost estimate summary table
- appendix C. Cost estimate detail : full Watana RCC
- appendix D. Cost estimate detail : High Devil Canyon RCC.