Ambler Road, Draft Environmental Impact Statement.
Author: Prepared by: U.S. Department of the Interior, Bureau of Land Management, in cooperation with: U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Environmental Protection Agency, Alatna Village Council, Allakaket Tribal Council (representing Allakaket Village), Hughes Traditional Council (representing Hughes Village), Noorvik Native Community, Northwest Arctic Borough, State of Alaska Department of Natural Resources ; participating agencies: Federal Highway Administration, National Park Service, U.S. Fish and Wildlife Service.
Publication: Anchorage, Alaska : United States Department of the Interior, Bureau of Land Management, Alaska State Office, [2019]
August 2019.
Physical description of original: 4 volumes (various pagings) : color illustrations, color maps ; 28 cm. in binder 30 cm.
Report Numbers: DOI-BLM-AK-F030-2016-0008-EIS
BLM/AK/PL-19/013+1610+F030
Note: The public comments to the draft along with BLM's responses are available at the bottom of the table below.
LINKS VIA ARLIS DOCUMENT SERVER
You can also consult the following related websites:
VOLUME | SECTION | SIZE |
Volume 1 | Chapters 1-3 ; Appendices A-F
This electronic document includes Attachment A of Appendix D, which was issued separately in the original release. |
PDF 5 MB |
Volume 2 | Appendices G-K
|
PDF 25 MB |
Volume 3 | Appendices L-P
|
PDF 13 MB |
Volume 4 | Maps | PDF 37 MB |
Public comments | Two versions of the public comments and BLM responses to the draft are available in Excel. Both spreadsheets are identical, just formatted differently. The large cell version allows you to view an entire comment and the response in separate cells running across the entire view screen. Public comments with narrower wrapped-text cell format |
Excel spreadsheet 1.3 MB each |