Ambler Road -- FEIS and Record of Decision
Ambler Road, Final Environmental Impact Statement.
Author: Prepared by: U.S. Department of the Interior, Bureau of Land Management.
In cooperation with: U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Environmental Protection Agency, Alatna Village Council, Allakaket Tribal Council (representing Allakaket Village), Hughes Traditional Council (representing Hughes Village), Noorvik Native Community, Northwest Arctic Borough, State of Alaska Department of Natural Resources.
Participating agencies: Federal Highway Administration, National Park Service, U.S. Fish and Wildlife Service.
Publication: Anchorage, Alaska : United States Department of the Interior, Bureau of Land Management, Alaska State Office, [2020]
March 2020.
Physical description of original: 4 volumes (various pagings) : color illustrations, color maps ; 28 cm.
Report numbers: DOI-BLM-AK-F030-2016-0008-EIS -- BLM/AK/PL-19/013+1610+F030
You can also consult the following related websites for related documents and more information about the Ambler Road project:
- The Draft EIS -- August 2019. The public comments to the Draft EIS along with BLM's responses are available in Excel spreadsheet format at the bottom of that webpage.
- The Draft Supplemental EIS -- October 2023.
- The Final Supplemental EIS -- April 2024.
- BLM's ePlanning website for the Ambler Road Project including the final and draft versions of the EIS and the record of decision (with various download optional for the draft by volume and by subsections (as an alternative way to view the documentation) as well as a lot of related documentation (application materials, meeting notes, scoping documents, supplement EIS to the final, etc.).
VOLUME | SECTION | SIZE |
Volume 1 |
Executive Summary ; Chapters 1-3 ; and Appendices A-F
- Table of contents
- Acronyms and abbreviations
- Executive summary
- Chapter 1. Introduction
- Chapter 2. Alternatives
- Chapter 3. Affected environment and environmental consequences
- Appendix A. Figures
- Appendix B. Chapter 1 introduction tables and supplemental information
- Appendix C. Chapter 2 alternatives tables and supplemental information
- Appendix D. Chapter 3 physical environment tables and supplemental information
- Appendix E. Chapter 3 biological resources tables and supplemental information
- Appendix F. Chapter 3 social systems tables and supplemental information
|
5.3 MB |
Volume 2 |
Appendices G-K
- Appendix G. Alternatives development memorandum
- Appendix H. Indirect and cumulative impacts associated with the Ambler Road
- Appendix I. Collaboration and consultation
- Appendix J. Section 106 programmatic agreement
- Appendix K. Cultural resources data gap report (redacted version due to sensitive content)
|
39 MB |
Volume 3 |
Appendices L-R
- Appendix L. Subsistence technical report
- Appendix M. ANILCA Section 810 preliminary evaluation
- Appendix N. Potential mitigation
- Appendix O. References
- Appendix P. Glossary
- Appendix Q. Substantive comments and BLM responses
- Appendix R. Analysis of data availability per 40 CFR 1502.22
|
14 MB |
Volume 4 |
Maps |
25 MB |
Ambler Road Environmental Impact Statement, Joint Record of Decision.
Author: Prepared by U.S. Department of the Interior, Bureau of Land Management and U.S. Army Corps of Engineers
Publication: [Anchorage, Alaska] : [United States Department of the Interior, Bureau of Land Management, Alaska State Office], [2020]
July 2020.
Physical description of original: 317 pages in various pagings : 25 color maps ; 28 cm.
Report Numbers: DOI-BLM-AK-F030-2016-0008-EIS
BLM/AK/PL-19/013+1610+F030
Access to complete volume.