1
by Boyle, Michael J.
Published April 18, 2012
Contents: ';
“... procedures (Appendix 1K). Some comments are identified as originating from other agencies: Alaska Dept...”Published April 18, 2012
Report Number(s): Docket no. PF09-11-000
Link to full text
2
Published July 1980
Contents: ';
“...This manual has been prepared to establish procedure for hydrostatically testing for the prebuild...”Link to full text
3
4
Published December 1981
Contents: ';
“... 15-16, 1981. The purpose of this study was to verify NWA's slope stability procedures by applying...”Report Number(s): 09-TR-0025 WBS 1.01.09.07
Link to full text
5
[Evaluation of slope stability procedures, Alaska segment, Alaska Natural Gas Transportation System]
Published [1981?]
Contents: ';
“... was to verify NWA's slope stability procedures by applying it to some selected cases."...”Report Number(s): 09-TR-0025 WBS 1.01.09.07
Link to full text
6
Published April 2011
“...Appendix 1J, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures...”Report Number(s): USAG-UR-SGREG-000002
Link to announcement regarding this volumeWebpage linking all volumes
7
Published December 2011
Contents: ';
“...These procedures address the requirements of the FERC procedures except where measures modified...”Report Number(s): FERC docket no. PF09-11-000 USAG-UR-SGREG-000002
Link to this volumeWebpage linking all volumes
8
9
Published November 1981
“...Alaska Highway Gas Pipeline Project (Yukon Section), Procedures for slope stability analytical...”Link to full text
10
Contents: ';
“... procedures for predicting the maximum circumferential and longitudinal stresses pipelines caused by nearby...”
Link to full text
Link to full text
11
12
Published November 1981
Contents: ';
“..."This report compares the design criteria and analytical procedures for slope stability proposed...”Report Number(s): 09-ML-0380 WBS 1.01.09.07
Link to full text
13
by Wright, Jeff C.
Published September 12, 2014
Contents: ';
“... the pre-filing procedures for the Alaska LNG Project. That report was filed jointly by the five corporate...”Published September 12, 2014
Report Number(s): Docket No. PF14-21-000 USAI-PE-SGEIS-00-0003
Link to full text
14
Published 8 February 1984
Contents: ';
“... selection are given for frost heave, soil data input, and procedures. Other design considerations include...”Link to full text
15
by Persily, Larry
Published November 17, 2017
Contents: ';
“... noted that FERC's wetland procedures are impacticable for the Alaska LNG Project. AGDC reminded FERC...”Published November 17, 2017
Direct link to this update
Website listing all Project updates
16
by Kuhn, Edwin
Published February 13, 1984
Contents: ';
“... data input, and procedures. Other design considerations include ditch plug design, ditch wall stability...”Published February 13, 1984
Report Number(s): GOA-84-1015
Link to full text
17
Contents: ';
“...The five corporate applicants are requesting approval to commence the pre-filing procedures...”
Report Number(s): Docket No. PF14-...-000 USAI-PE-SGEIS-00-0003
Link to full text
18
Published April 2011
Contents: ';
“... -- Appendix 1J. Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures...”Report Number(s): USAG-UR-SGREG-000002 (Report no. 1) USAG-UR-SGREG-000003 (Report no. 10)
Link to report No. 1Webpage linking all volumes
19
by Watson, Linwood A., Jr.
Published May 22, 1995
Contents: ';
“...Background -- Proposal -- Interventions, protests, and procedural motions -- Discussion -- Earth...”Published May 22, 1995
Report Number(s): Docket no. CP88-105-000
Link to full text
20
by Rhett, John T., Jr.
Published February 15, 1984
Contents: ';
“... for design mode selection are given for frost heave, soil data input, and procedures. Other design...”Published February 15, 1984
Report Number(s): D-0025072 GOA-84-1015
Link to full text