1
Published 8 February 1984
...Pipeline design criteria manual. 13.0, Design modes (Revison 3)...
Link to full text
2
by Rhett, John T., Jr.
Published February 15, 1984
Contents: '; ... of the DCM manual, and conditional approval is given until three DCM appendices are completed and reflected...

Report Number(s): D-0025072 GOA-84-1015

Link to full text
3
by Kuhn, Edwin
Published February 13, 1984
Contents: '; ...The letter describes Revision 3 of Section 13 of the DCM manual, which reflect coordination...

Report Number(s): GOA-84-1015

Link to full text
4
by Rhett, John T., Jr.
Published April 16, 1985
Contents: '; ... Revision 4 of Section 13 of the DCM manual ("Pipeline design criteria manual. 13.0, Design modes...

Report Number(s): D-0025222

Link to full text
5
by Black, William T.
Published September 7, 1983
Contents: '; ...The letter consists of comments to Appendix 21A of the "Pipeline design criteria manual...

Report Number(s): DOC ID R-0007222

Link to full text
6
by Rhett, John T., Jr.
Published April 16, 1985
Contents: '; ... of the "Pipeline design criteria manual" (also called "Design criteria manual" or DCM). All these issues deal...
Link to full text
7
by Ellis, Earl
Published April 15, 1985
Contents: '; ... of the Design criteria manual. All these issues deal with frozen soil conditions and frost heaves....
Link to full text