Design criteria manual - Appendix 21A, Frost heave criteria and methodology, dated May 25, 1983

The letter consists of comments to Appendix 21A of the "Pipeline design criteria manual." (The manual is often referred to as "Design criteria manual" or simply as "DCM."). The OFI Office with the assistance of the Cold Regions Engineering and Technical Committee comple...

Full description

Saved in:
Bibliographic Details
Main Author: Black, William T.
Corporate Author: Office of the Federal Inspector (OFI)
Corporate Contributor(s):Northwest Alaskan Pipeline Company
Document Type: Letter
Publisher:Office of the Federal Inspector (OFI)
Report Numbers:DOC ID R-0007222
Date:September 7, 1983
Addressee / Recipient:Kuhn, Edwin
Sponsor / Funder:Northwest Alaskan Pipeline Company
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 02125cmm a22003373 4500
001 2369706
003 SIRSI
008 141016s1983 000 0 eng u
088 |a DOC ID R-0007222 
100 1 |a Black, William T. 
110 1 |a Office of the Federal Inspector (OFI) 
245 1 0 |a Design criteria manual - Appendix 21A, Frost heave criteria and methodology, dated May 25, 1983 
260 |a Office of the Federal Inspector (OFI) 
300 |a 6 p. 
380 |a Letter 
518 |a September 7, 1983 
546 |a English 
500 |a Title from subject line. 
500 |a This document is a letter to Edwin (Al) Kuhn (Director of Government Affairs, Northwest Alaskan Pipeline Company) from William T. Black (Director of Office of Engineering Review, Office of the Federal Inspector for the Alaska Natural Gas Transportation System) . It consists of 5 pages plus enclosure (1 page). The enclosure originally accompanied a similar letter dated August 16, 1983, which is a bibliography of supporting reports. 
500 |a This document is archived in Box 7, File 8a of the document collection for Office of the Federal Inspector for the Alaska Natural Gas Transportation System, housed at National Archives and Records Administration, Washington, D.C. 
520 |a The letter consists of comments to Appendix 21A of the "Pipeline design criteria manual." (The manual is often referred to as "Design criteria manual" or simply as "DCM."). The OFI Office with the assistance of the Cold Regions Engineering and Technical Committee completed the review of this appendix along with twelve supporting documents (listed in the enclosure). OFI has given conditional approval of the document. 
653 |a Pipelines 
653 |a Design and construction 
653 |a Chilled pipe effects 
653 |a Frost heave 
690 |a PF-CONS 
700 |a Kuhn, Edwin 
710 |a Northwest Alaskan Pipeline Company 
740 0 |a Pipeline design criteria manual. Appendix 21A, Frost heave criteria and methodology 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Letter/Letter_Black_1983_Kuhn.pdf 
596 |a 10