Point Thomson Project EIS, draft environmental impact statement
This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit....
Saved in:
Alternate Title: | Point Thomson Project draft EIS Point Thomson Project environmental impact statement, draft environmental impact statement |
---|---|
Document Type: | Report |
Publisher: | U.S. Army Corps of Engineers. Alaska District. Regulatory Division |
Date: | November 2011 |
Subjects: | |
Online Access: | View Full Text View Full Text |
Library Holdings: | Print Versions |
Summary: | This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit. The plan, to be located 60 miles east of Prudhoe Bay, features a three-pad configuration using long-reach directional drilling from onshore pads. The central processing facility is located on an expanded existing central pad. |
---|---|
Physical Description: | 9 PDF files (originally: 8 print vols. + 1 print summary + 2 CD-ROMs accompanying summary) |
Notes: | Running tile: Point Thomson Project draft EIS |