Point Thomson Project EIS, draft environmental impact statement

This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit....

Full description

Saved in:
Bibliographic Details
Alternate Title:Point Thomson Project draft EIS

Point Thomson Project environmental impact statement, draft environmental impact statement
Document Type: Report
Publisher:U.S. Army Corps of Engineers. Alaska District. Regulatory Division
Date:November 2011
Subjects:
Online Access:View Full Text
View Full Text
Library Holdings:Print Versions
Description
Summary:This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit. The plan, to be located 60 miles east of Prudhoe Bay, features a three-pad configuration using long-reach directional drilling from onshore pads. The central processing facility is located on an expanded existing central pad.
Physical Description:9 PDF files (originally: 8 print vols. + 1 print summary + 2 CD-ROMs accompanying summary)
Notes:Running tile: Point Thomson Project draft EIS