LEADER |
01043cmm a22002773 4500 |
001 |
1472367 |
003 |
SIRSI |
008 |
121025s1981 000 0 eng u |
110 |
1 |
|
|a Foothills Pipe Lines (South Yukon) Ltd.
|
245 |
1 |
0 |
|a Approach to watercrossing design and construction planning, submission 4-5 : addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline
|
246 |
|
|
|a Addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline
|
260 |
|
|
|a Foothills Pipe Lines (South Yukon) Ltd.
|
518 |
|
|
|a December 1981
|
300 |
|
|
|a 102 p.
|
380 |
|
|
|a Report
|
546 |
|
|
|a English
|
653 |
|
|
|a Waterbodies
|
653 |
|
|
|a Stream crossings
|
653 |
|
|
|a Design and construction
|
653 |
|
|
|a Environmental impacts
|
653 |
|
|
|a Dredging
|
610 |
|
|
|a Alaska Highway Gas Pipeline Project
|
690 |
|
|
|a PF-CONS
|
690 |
|
|
|a PF-ENVI
|
856 |
|
|
|u https://www.arlis.org/docs/vol1/AlaskaGas/Report4/Report_Foothills_1981_ApproachWatercrossing.pdf
|
596 |
|
|
|a 10
|