Approach to watercrossing design and construction planning, submission 4-5 : addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline

Saved in:
Bibliographic Details
Alternate Title:Addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline
Corporate Author: Foothills Pipe Lines (South Yukon) Ltd.
Document Type: Report
Publisher:Foothills Pipe Lines (South Yukon) Ltd.
Date:December 1981
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 01043cmm a22002773 4500
001 1472367
003 SIRSI
008 121025s1981 000 0 eng u
110 1 |a Foothills Pipe Lines (South Yukon) Ltd. 
245 1 0 |a Approach to watercrossing design and construction planning, submission 4-5 : addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline 
246 |a Addendum to the environmental impact statement for the Yukon section of the Alaska Highway Gas Pipeline 
260 |a Foothills Pipe Lines (South Yukon) Ltd. 
518 |a December 1981 
300 |a 102 p. 
380 |a Report 
546 |a English 
653 |a Waterbodies 
653 |a Stream crossings 
653 |a Design and construction 
653 |a Environmental impacts 
653 |a Dredging 
610 |a Alaska Highway Gas Pipeline Project 
690 |a PF-CONS 
690 |a PF-ENVI 
856 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report4/Report_Foothills_1981_ApproachWatercrossing.pdf 
596 |a 10