|
|
|
|
LEADER |
00812cmm a22002773 4500 |
001 |
1470594 |
003 |
SIRSI |
008 |
121015n1977 000 0 eng u |
110 |
1 |
|
|a Klohn Leonoff Consultants Ltd.
|
245 |
0 |
0 |
|a Final report frost heave drilling program (MP 0 to 40)
|
260 |
|
|
|a Klohn Leonoff Consultants Ltd.
|
518 |
|
|
|a December 22, 1977
|
300 |
|
|
|a 271 p.
|
380 |
|
|
|a Report
|
546 |
|
|
|a English
|
536 |
|
|
|a AL0890
|
653 |
|
|
|a Frost heave
|
653 |
|
|
|a Design and construction
|
653 |
|
|
|a Permafrost
|
653 |
|
|
|a Right-of-way
|
653 |
|
|
|a Routing
|
648 |
|
|
|a September 19 to November 1977
|
690 |
|
|
|a PF-CONS
|
710 |
|
|
|a Foothills Pipe Lines (Yukon) Ltd
|
856 |
4 |
0 |
|u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_Klohn_1977_FinalReportFrostHeaveDrilling.pdf
|
596 |
|
|
|a 10
|