Performance predictions for Fairbanks frost heave test facility

Saved in:
Bibliographic Details
Corporate Author: EBA Engineering Consultants Ltd.
Corporate Contributor(s):Foothills Pipe Lines (Yukon) Ltd.

Northwest Alaskan Pipeline Company
Document Type: Report
Publisher:EBA Engineering Consultants Ltd.
Date:February 1980
Sponsor / Funder:Foothills Pipe Lines (Yukon) Ltd.

Northwest Alaskan Pipeline Company
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 00882cmm a22002893 4500
001 1470462
003 SIRSI
008 121010n1980 000 0 eng u
110 1 |a EBA Engineering Consultants Ltd. 
245 0 0 |a Performance predictions for Fairbanks frost heave test facility 
260 |a EBA Engineering Consultants Ltd. 
518 |a February 1980 
300 |a 123 p. 
380 |a Report 
546 |a English 
610 |a Alaska Highway Gas Pipeline Project 
653 |a Design and construction 
653 |a Engineering 
653 |a Frost heave 
653 |a Pipelines 
653 |a Erosion control 
653 |a Soil 
690 |a PF-CONS 
710 |a Foothills Pipe Lines (Yukon) Ltd. 
710 |a Northwest Alaskan Pipeline Company 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_EBA_1980_PerformPredFairbanksFrostHeave.pdf 
596 |a 10