Alaska Department of Fish and Game position statement on mitigation compensation for the Alaska Gas Pipeline Project

This position statement is in response to Northwest Alaskan Pipeline Companys request for clarification of draft stipulation 1.8.2.2 to be attached to the right-of-way lease for the gas pipeline.

Saved in:
Bibliographic Details
Alternate Title:Position statement on mitigation compensation for the Alaska Gas Pipeline Project
Main Author: Skoog, Ronald O.
Corporate Author: Alaska Department of Fish and Game (ADF&G)
Document Type: Legal
Publisher:Alaska Department of Fish and Game (ADF&G)
Date:November 16, 1979
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 01296cmm a22003133 4500
001 1470341
003 SIRSI
008 121009n1979 000 0 eng u
100 1 |a Skoog, Ronald O. 
110 1 |a Alaska Department of Fish and Game (ADF&G) 
245 1 0 |a Alaska Department of Fish and Game position statement on mitigation compensation for the Alaska Gas Pipeline Project 
246 3 0 |a Position statement on mitigation compensation for the Alaska Gas Pipeline Project 
260 |a Alaska Department of Fish and Game (ADF&G) 
518 |a November 16, 1979 
300 |a 4 pages 
380 |a Legal 
546 |a English 
500 |a Caption title. 
500 |a A one-page cover letter accompanies this three-page position statement. 
520 |a This position statement is in response to Northwest Alaskan Pipeline Companys request for clarification of draft stipulation 1.8.2.2 to be attached to the right-of-way lease for the gas pipeline. 
596 |a 10 
653 |a Mitigation 
653 |a Right-of-way 
653 |a Leases 
653 |a Habitat 
610 2 0 |a Northwest Alaskan Pipeline Company 
610 2 0 |a Alaska Highway Gas Pipeline Project 
690 |a PF-PROJ 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Legal/Legal_ADF&G_1979_PositionStatementMitigation.pdf