Pipeline design flood report
This report presents a methodology for the estimation of a Pipeline Design Flood for streams crossed by the Northwest Alaskan (Gas) Pipeline. The studies establish discharges upon which to base pipeline river crossing designs. The Pipeline Design Flood estimates have been computed for nine selected...
Saved in:
Corporate Author: | |
---|---|
Corporate Contributor(s): | Northwest Alaskan Pipeline Company |
Document Type: | Report |
Publisher: | Northern Technical Services |
Date: | October 1981 |
Sponsor / Funder: | Northwest Alaskan Pipeline Company |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
LEADER | 01176cmm a22002893 4500 | ||
---|---|---|---|
001 | 1470272 | ||
003 | SIRSI | ||
008 | 121009n1981 000 0 eng u | ||
110 | 1 | |a Northern Technical Services | |
245 | 1 | 0 | |a Pipeline design flood report |
260 | |a Northern Technical Services | ||
518 | |a October 1981 | ||
300 | |a 69 p. | ||
380 | |a Report | ||
546 | |a English | ||
520 | |a This report presents a methodology for the estimation of a Pipeline Design Flood for streams crossed by the Northwest Alaskan (Gas) Pipeline. The studies establish discharges upon which to base pipeline river crossing designs. The Pipeline Design Flood estimates have been computed for nine selected streams in the Tanana River basin that will be crossed by the pipeline. | ||
653 | |a Flood | ||
653 | |a Design and construction | ||
653 | |a Stream crossings | ||
653 | |a Fish streams | ||
610 | |a Northwest Alaskan Gas Pipeline | ||
651 | |a Tanana River watershed | ||
710 | |a Northwest Alaskan Pipeline Company | ||
690 | |a PF-CONS | ||
690 | |a PF-ENVI | ||
856 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report2/Report_NTS_1981_PipelineDesignFloodReport.pdf | ||
596 | |a 10 |