41
Published [2014-2015]
...Initial Study Report. Study plan Section 9.11, Study of fish passage feasibility at Watana Dam....

Report Number(s): SuWa 223

Direct link to the first part of this document.
List of all parts of this document (see Section 9.11). List includes related Initial Study Reports.
42
Published [2014]
...Initial Study Report. Study plan Section 6.6, Fluvial geomorphology modeling below Watana Dam study...

Report Number(s): SuWa 207

Direct link to the main text of this report.
List of all parts of this document (see Section 6.6). List includes all draft Initial Study Reports.
43
44
45
Published 2014]
...Initial Study Report. Study plan Section 9.16, Eulachon run timing, distribution, and spawning...

Report Number(s): SuWa 207

Direct link to this document.
List of all draft Initial Study Reports.
46
Published [2014-2015]
...Initial Study Report. Study plan Section 6.6, Fluvial geomorphology modeling below Watana Dam study....

Report Number(s): SuWa 223

Direct link to the first part of this report.
List of all parts of this document (see Section 6.6). List includes related Initial Study Reports.
47
48
49
Published 2014]
...Initial Study Report. Study plan Section 9.10, The future Watana reservoir fish community and risk...

Report Number(s): SuWa 207

Direct link to this document.
List of all draft Initial Study Reports.
52
Published [2014]
...Initial Study Report. Study plan Section 9.15, Analysis of fish harvest in and downstream...

Report Number(s): SuWa 207

Direct link to this document.
List of all draft Initial Study Reports.
54
Published 2016 June 23.
...Title should read: Comments on the Alaska Energy Authority's Initial Study Report, 2014 technical...

Report Number(s): SuWa 294

Link to full text
59
by Dyok, Wayne,
Published 2014 October 8.
...'s comments on the Initial Study Report for the Susitna-Watana Hydroelectric Project....

Report Number(s): SuWa 304

Link to full text