Hydroelectric power development, upper Susitna River basin, southcentral Railbelt area, Alaska. Final environmental impact statement.

"The proposed action discussed in this draft environmental impact statement is a two-dam system located in the Upper Susitna River Basin, which will provide hydroelectric power to the Southcentral Railbelt region in Alaska."--P. 3.

Saved in:
Bibliographic Details
Alternate Title:Final environmental impact statement, hydroelectric power development, upper Susitna River basin, southcentral Railbelt area, Alaska

Final environmental impact statement, southcentral Railbelt area, Alaska, hydroelectric power development, upper Susitna River basin
Corporate Contributor(s):United States. Army. Corps of Engineers.

United States. Army. Corps of Engineers. Alaska District.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Office of the Chief of Engineers, Dept. of the Army,
Report Numbers:APA 870

SUS 320
Series:Document (Susitna Hydroelectric Project) ; no. 870.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The proposed action discussed in this draft environmental impact statement is a two-dam system located in the Upper Susitna River Basin, which will provide hydroelectric power to the Southcentral Railbelt region in Alaska."--P. 3.
Physical Description:iii, iv, 380 p., [10] leaves of plates : ill., maps ; 27 cm.
Notes:Cover title.

"Responsible office: Alaska District, Corps of Engineers"--P. i (1st group).

"January 1977."

Series statement from label on cover.

Although the cover is dated 1977, the report was issued with a letter of transmittal dated July 1979. Page iii (1st group)--states the final statement to EPA was submitted on June 26, 1979.
Bibliography:Includes bibliographical references (p. 103-105).