Cover letter from Janet Reiser, AEA Executive Director, January 16, 2018, in Report to the Legislature 2017, to Alaska Legislature summarizing Susitna-Watana Project closeout status.

This letter accompanies the 2017 annual report about the Susitna-Watana Hydroelectric Project. It is from Janet Reiser, Executive Director of the Alaska Energy Authority. That annual report was written about a year after being closed down. The letter explains how the investment in the closed project...

Full description

Saved in:
Bibliographic Details
Alternate Title:Report to the Legislature 2017.
Main Author: Reiser, Janet,
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,

Alaska. Legislature (2018),
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 308
Series:Susitna-Watana Hydroelectric Project document ; no. 308.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03238cam a2200577Ia 4500
001 5040543
003 SIRSI
005 20180702130514.0
007 ta
007 cr cn||a||||||
008 180702s2018 aku s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)1042336827 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 308 
088 |a SuWa 308 
098 |a SuWa 00308 
100 1 |a Reiser, Janet,  |e author. 
245 1 0 |a Cover letter from Janet Reiser, AEA Executive Director, January 16, 2018, in Report to the Legislature 2017, to Alaska Legislature summarizing Susitna-Watana Project closeout status. 
260 |a Anchorage, Alaska :  |b Alaska Energy Authority,  |c [2018] 
300 |a 1 page ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 308 
500 |a Title supplied by ARLIS. staff members. 
500 |a ARLIS assigned report number: SuWa 308. 
513 |a Annual report. 
500 |a This document is the cover letter (on page 2) from "Report to the Legislature 2017" for the Susitna-Watana Hydroelectric Project. It is cataloged separately because it is being cited as an individual document. 
500 |a This letter was not posted on the Susitna-Watana Hydroelectric Project's website. 
530 |a Available also in electronic format on the Internet. 
520 |a This letter accompanies the 2017 annual report about the Susitna-Watana Hydroelectric Project. It is from Janet Reiser, Executive Director of the Alaska Energy Authority. That annual report was written about a year after being closed down. The letter explains how the investment in the closed project and collected data are preserved, and explains what steps need to be taken under FERC's Integrated Licensing Process should the project be restarted. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
610 1 0 |a United States.  |b Federal Energy Regulatory Commission. 
650 0 |a Water-power  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Hydroelectric power plants  |x Licenses  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Licenses  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Planning. 
610 2 7 |a Susitna-Watana Hydroelectric Project.  |2 fast  |0 (OCoLC)fst01917261 
650 7 |a Dams  |x Planning.  |2 fast  |0 (OCoLC)fst00887365 
650 7 |a Hydroelectric power plants  |x Planning.  |2 fast  |0 (OCoLC)fst00964961 
650 7 |a Water-power  |x Planning.  |2 fast  |0 (OCoLC)fst01355318 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |i Excerpted pages from (work):  |a Susitna-Watana Hydroelectric Project.  |t Report to the Legislature 2017. 
710 2 |a Alaska Energy Authority,  |e issuing body. 
710 1 |a Alaska.  |b Legislature  |d (2018),  |e addressee. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 308. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/3/SuWa308a.pdf  |3 Searchable version.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/3/SuWa308b.pdf  |3 Original non-searchable version.  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201807 
596 |a 9 10