Susitna Hydroelectric Project. Big game studies, Phase II - progress report. Volume II, Moose, downstream /
"Objectives of this study were to determine the probable nature and approximate magnitude of impacts of the proposed Susitna River hydroelectric project on moose (Alces alces gigas Miller) in areas along the Susitna River downstream from the prospective Devil Canyon dam site to Cook Inlet."...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Big game studies, Phase 2 - progress report. Volume 2, Moose, downstream Big game studies, Phase II - progress report. Volume II, Moose, downstream Volume II, Moose, downstream Moose, downstream Susitna Hydroelectric Project. Phase II progress report, big game studies. Volume II, Moose, downstream Susitna Hydroelectric Project. Phase 2 progress report, big game studies. Volume 2, Moose, downstream Phase II progress report, big game studies. Volume II, Moose, downstream |
---|---|
Main Author: | |
Corporate Contributor(s): | Alaska. Department of Fish and Game Susitna Hydroelectric Project. Alaska Power Authority, |
Publisher: | Alaska Department of Fish and Game, |
Report Numbers: | APA 407 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 407. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02927cam a2200565Ia 4500 | ||
---|---|---|---|
001 | 375897 | ||
003 | SIRSI | ||
005 | 20170530102448.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 030714s1983 akuab bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)52609211 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b B54 no. 407 | |
088 | |a APA 407 | ||
049 | |a RLAA | ||
100 | 1 | |a Modafferi, Ronald D., |e author. | |
245 | 1 | 0 | |a Susitna Hydroelectric Project. |p Big game studies, Phase II - progress report. |n Volume II, |p Moose, downstream / |c Ronald D. Modafferi ; Alaska Department of Fish and Game. |
246 | 3 | |a Susitna Hydroelectric Project. |p Big game studies, Phase 2 - progress report. |n Volume 2, |p Moose, downstream | |
246 | 3 | 0 | |a Big game studies, Phase II - progress report. |n Volume II, |p Moose, downstream |
246 | 3 | 0 | |a Volume II, |p Moose, downstream |
246 | 3 | 0 | |a Moose, downstream |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Phase II progress report, big game studies. |n Volume II, |p Moose, downstream |
246 | 3 | |a Susitna Hydroelectric Project. |p Phase 2 progress report, big game studies. |n Volume 2, |p Moose, downstream | |
246 | 3 | |a Phase II progress report, big game studies. |n Volume II, |p Moose, downstream | |
260 | |a [Anchorage, Alaska] : |b Alaska Department of Fish and Game, |c [1983] | ||
300 | |a xxii, 114 pages : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "Submitted to the Alaska Power Authority." | ||
500 | |a "April, 1983." | ||
510 | 3 | |a Assigned APA Document no. 407 in Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a "Objectives of this study were to determine the probable nature and approximate magnitude of impacts of the proposed Susitna River hydroelectric project on moose (Alces alces gigas Miller) in areas along the Susitna River downstream from the prospective Devil Canyon dam site to Cook Inlet."--Page iv. | ||
504 | |a Includes bibliographical references (pages 110-112). | ||
650 | 0 | |a Moose |x Effect of dams on |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Moose |x Habitat |z Alaska |z Susitna River Watershed. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River Watershed. | |
710 | 1 | |a Alaska. |b Department of Fish and Game |e issuing body. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority, |e commissioning body. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 407. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/4/APA407.pdf |z ARLIS Document Server |
901 | |a 3755 |f orig | ||
098 | |a APA 00407 | ||
596 | |a 9 10 |