Susitna Hydroelectric Project. Final Phase I report, big game studies. Volume III, Moose, upstream /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Final Phase 1 report, big game studies. Volume 3, Moose, upstream

Final Phase I report, big game studies. Volume III, Moose, upstream

Big game studies. Volume III, Moose, upstream

Moose, upstream

Susitna Hydroelectric Project. Phase I final report, big games studies. Volume III, Moose, upstream

Phase I final report, big game studies. Volume III, Moose, upstream
Additional Author(s):Ballard, Warren B.

Gardner, Craig L.,

Westlund, John H.,

Dau, J.
Corporate Contributor(s):Susitna Hydroelectric Project.

Alaska Power Authority,

Alaska. Department of Fish and Game
Publisher:Alaska Department of Fish and Game,
Report Numbers:APA 408

APA 1331

SUS 112
Series:Document (Susitna Hydroelectric Project) ; no. 408.
Document (Susitna Hydroelectric Project) ; no. 1331.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Methodology
  • Study area
  • Results and discussion
  • Potential impacts on moose
  • Proposed studies for Phase II
  • appendix A. [Maps]
  • appendix B. Seasonal and total home range sizes of individual radio-collared moose studied in the Nelchina and upper Susitna River basins of Southcentral Alaska from October 1976 through mid-August 1981. (statistical table).