Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan |
---|---|
Corporate Contributor(s): | Alaska Power Authority, Entrix, Inc., HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. United States. Federal Energy Regulatory Commission. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 2921 SUS 564 |
Series: | Impact assessment and mitigation report ;
no. 1. Document (Susitna Hydroelectric Project) ; no. 2921. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | vii, 148 leaves : illustrations, maps ; 28 cm. |
---|---|
Notes: | At head of title: Susitna Hydroelectric Project. "October 1985." "Susitna file no. 4.3.1.9." One of the series appears on the cover as: Report No. 1. "Federal Energy Regulatory Commission Project no. 7114"--Cover. |
Report Type: | Final report. |
Related Titles: | Revision of: Access, construction and transmission aquatic and mitigation plan. [Draft]. Anchorage, Alaska : Wood-Clyde Consultants : Entrix, Inc., [1985] Draft migitation report ; no. 1 Document (Susitna Hydroelectric Project) ; no. 2921d |
Bibliography: | Includes bibliographical references (leaves 141-148). |
Related Items: | Revision of: Access, construction and transmission aquatic and mitigation plan. -- [Draft]. -- Anchorage, Alaska : Wood-Clyde Consultants : Entrix, Inc., [1985]. -- (Draft migitation report ; no. 1). (Document (Susitna Hydroelectric Project) ; no. 2921d) |