Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan
Corporate Contributor(s):Alaska Power Authority,

Entrix, Inc.,

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 2921

SUS 564
Series:Impact assessment and mitigation report ; no. 1.
Document (Susitna Hydroelectric Project) ; no. 2921.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:vii, 148 leaves : illustrations, maps ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"October 1985."

"Susitna file no. 4.3.1.9."

One of the series appears on the cover as: Report No. 1.

"Federal Energy Regulatory Commission Project no. 7114"--Cover.
Report Type:Final report.
Related Titles:Revision of: Access, construction and transmission aquatic and mitigation plan. [Draft]. Anchorage, Alaska : Wood-Clyde Consultants : Entrix, Inc., [1985] Draft migitation report ; no. 1 Document (Susitna Hydroelectric Project) ; no. 2921d
Bibliography:Includes bibliographical references (leaves 141-148).
Related Items:Revision of: Access, construction and transmission aquatic and mitigation plan. -- [Draft]. -- Anchorage, Alaska : Wood-Clyde Consultants : Entrix, Inc., [1985]. -- (Draft migitation report ; no. 1). (Document (Susitna Hydroelectric Project) ; no. 2921d)