Instream flow relationships report. Volume no. 1 /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Instream flow relationships report. Volume no. 1 Settlement process, instream flow relationships report, volume no. 1. Draft instream flow relationships report. Volume no. 2. |
---|---|
Corporate Contributor(s): | Arctic Environmental Information and Data Center (Alaska) Alaska Power Authority, Entrix, Inc. HARZA-EBASCO Susitna Joint Venture. R & M Consultants. Susitna Hydroelectric Project. Trihey and Associates. United States. Federal Energy Regulatory Commission. Woodward-Clyde Consultants. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3060 SUS 602 |
Original Source: | Revision of: Settlement process, instream flow relationships report, volume no. 1. Complemented by (expression): Draft instream flow relationships report. Volume no. 2. |
Edition: | [Final]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3060. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03487cam a2200673Ia 4500 | ||
---|---|---|---|
001 | 375137 | ||
003 | SIRSI | ||
005 | 20160729131546.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr bn||a|||||| | ||
008 | 030701e198512 akuabd bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCA |d OCLCF |d OCL |d OCLCQ |d RLA | ||
035 | |a (OCoLC)52535508 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b F472 no. 3060 | |
088 | |a APA 3060 | ||
088 | |a SUS 602 | ||
245 | 0 | 0 | |a Instream flow relationships report. |n Volume no. 1 / |c prepared by Trihey and Associates and Entrix, Inc ; with assistance from Harza-Ebasco Susitna Joint Venture; R&M Consultants, Inc.; University of Alaska, Arctic Environmental Information & Data Center; Woodward-Clyde Consultants, Inc. ; under contract to Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Instream flow relationships report. |n Volume no. 1 | |
250 | |a [Final]. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1985] | ||
300 | |a 227 pages in various pagings : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 3060 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
513 | |a Final report. | ||
500 | |a "December 1985." | ||
500 | |a "Susitna file no. 4.3.1.3." | ||
510 | 3 | |a Assigned APA Document no. 3060 in Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned number SUS 602 in the Susitna Aquatic Impact Assessment Project bibliography. | |
500 | |a "Federal Energy Regulatory Commission Project No. 7114"--Cover. | ||
500 | |a Volumes 1 and 2 of this set serve as a summary to the series: Instream flow relationships report series, technical report. | ||
500 | |a This is a revision of: Settlement process, instream flow relationships report, volume no. 1. -- Working draft. (Numbered SUS 455). | ||
500 | |a Volume no. 2 of this set is known as a draft titled: Draft instream flow relationships report, Volume no. 2. It is called "advance copy" and no final has been found. | ||
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
504 | |a Includes bibliographical references (pages VII-1 to VII-26). | ||
650 | 0 | |a Instream flow |z Alaska |z Susitna River. | |
650 | 0 | |a Stream measurements |z Alaska |z Susitna River. | |
650 | 0 | |a Fishes |x Habitat |z Alaska |z Susitna River. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Environmental aspects. |
710 | 2 | |a Arctic Environmental Information and Data Center (Alaska) | |
710 | 2 | |a Alaska Power Authority, |e issuing body, |e sponsoring body. | |
710 | 2 | |a Entrix, Inc. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a R & M Consultants. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Trihey and Associates. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
710 | 2 | |a Woodward-Clyde Consultants. | |
730 | 0 | |i Revision of: |a Settlement process, instream flow relationships report, volume no. 1. | |
730 | 0 | |i Complemented by (expression): |a Draft instream flow relationships report. |n Volume no. 2. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3060. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/30/APA3060.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SUS 00602 | ||
098 | |a APA 03060 |