Man-in-the-Arctic Program (MAP) technical documentation report /
"This report is the culmination of an effort to completely document the Institute of Social and Economic Research (ISER) Man-in-the-Arctic (MAP) Modeling System and simultaneously to develop timely projections of economic activity for Alaska's Railbelt. The purpose of the study is ... spec...
Saved in:
Alternate Title: | Before the Federal Energy Regulatory Commission, Application for license for major project, Susitna Hydroelectric Project. Volume 2B, Man-in-the-Arctic Program (MAP) technical documentation report Susitna Hydroelectric Project, Man-in-the-Arctic Program (MAP) technical documentation report Man-in-the-Arctic Program (MAP) economic modeling system technical documentation report |
---|---|
Additional Author(s): | Goldsmith, Oliver Scott. |
Corporate Contributor(s): | Susitna Hydroelectric Project. Alaska Power Authority. University of Alaska Fairbanks. Institute of Social and Economic Research. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1795 SUS 195 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1795. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03354cam a2200589Ia 4500 | ||
---|---|---|---|
001 | 374952 | ||
003 | SIRSI | ||
005 | 20120612013217.0 | ||
007 | cr cn||||a|||| | ||
007 | he bmu|||bbca | ||
008 | 030626s1983 akua bt s000 0 eng d | ||
035 | |a (OCoLC)52510035 | ||
040 | |a RLA |c RLA |d OCLCQ |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 1795 | ||
088 | |a SUS 195 | ||
090 | |a TK1425.S8 |b F471 no. 1795 | ||
245 | 0 | 0 | |a Man-in-the-Arctic Program (MAP) technical documentation report / |c prepared by Oliver Scott Goldsmith, Institute of Social and Economic Research; prepared for HARZA-EBASCO Susitna Joint Venture. |
246 | 1 | 4 | |a Before the Federal Energy Regulatory Commission, Application for license for major project, Susitna Hydroelectric Project. |n Volume 2B, |p Man-in-the-Arctic Program (MAP) technical documentation report |
246 | 3 | |a Susitna Hydroelectric Project, Man-in-the-Arctic Program (MAP) technical documentation report | |
246 | 1 | 5 | |a Man-in-the-Arctic Program (MAP) economic modeling system technical documentation report |
260 | |a [Alaska] : |b Alaska Power Authority, |c [1983] | ||
300 | |a 713 p. in various pagings : |b ill. ; |c 28 cm. | ||
337 | |a computer |2 rdamedia | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 1795 | |
338 | |a online resource |2 rdacarrier | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "Institute of Social and Economic Research MAP Documentation May 1983"--Report header. | ||
500 | |a "July 1983." | ||
500 | |a "June 1983"--Added title page. | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA document no. 1795 in Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned SUS document no. 195 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet and in microfiche format. | ||
520 | |a "This report is the culmination of an effort to completely document the Institute of Social and Economic Research (ISER) Man-in-the-Arctic (MAP) Modeling System and simultaneously to develop timely projections of economic activity for Alaska's Railbelt. The purpose of the study is ... specifically, to support the state licensing application before the Federal Energy Regulatory Commission (FERC) for the Susitna hydroelectric project."--P. [1]. | ||
504 | |a Includes bibliographical references (p. [P-1]-P-9). | ||
610 | 2 | 0 | |a University of Alaska Fairbanks. |b Man in the Arctic Program. |
651 | 0 | |a Alaska |x Economic conditions |x Mathematical models. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
700 | 1 | |a Goldsmith, Oliver Scott. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a University of Alaska Fairbanks. |b Institute of Social and Economic Research. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1795. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/17/APA1795.pdf |z Link to this volume. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna/17/APA1792.html |z Link to list of related volumes in this set (APA 1792-1809). |z ARLIS Document Server |
098 | |a APA 01795 | ||
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SUS 00195 |