Subtask 7.10, Aquatic studies procedures manual. Phase II. Final draft (2nd ed.). 1982-83 (FY 83) /

"This Phase II (July 1, 1982 to June 30, 1983) procedures manual addresses changes, deletions, and additions to the Phase I (July 1, 1981 to June 30, 1982) procedures manual."--Page 3.

Saved in:
Bibliographic Details
Alternate Title:Subtask 7.10, Aquatic studies procedures manual.

Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10, Aquatic studies procedures manual. Phase II. Final draft (2nd ed.). 1982-83 (FY 83)

Aquatic studies procedures manual. Phase II. Final draft (2nd ed.). 1982-83 (FY 83)

Phase II, Final draft (2nd ed.). 1982-83 (FY 83)
Corporate Author: Alaska. Susitna Hydro Aquatic Studies.
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.

Alaska. Susitna Hydro Aquatic Studies. Phase II.
Publisher:Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies,
Report Numbers:APA 938 (draft 3)

RTS 14 (draft 3)
Edition:2nd. ed., 6/30/83 (corrected).
Series:Document (Susitna Hydroelectric Project) ; no. 938d3.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • I. Introduction
  • II. Technical procedures: A. Adult Anadromous Fisheries Studies ; B. Resident and Juvenile Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies ; D. Data processing
  • III. Data procedures: A. Adult Anadromous Fisheries Studies ; B. Resident and Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies
  • IV. Quality control: A. Adult Anadromous Fisheries Studies ; B. Resident and Juvenile Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies ; D. Data routing
  • V. Report schedule
  • VI. Personnel
  • VII. Literature cited.