Wood frog occupancy and habitat use, Study plan Section 10.18, Study Completion Report /

A study is being conducted on wood frogs in the Susitna-Watana Hydroelectric Project area with a focus on assessment of potential effects on them from development of the proposed Project and ways to mitigate those effects. The study includes water bodies and wetlands in the proposed Project area and...

Full description

Saved in:
Bibliographic Details
Alternate Title:Study Completion Report. Wood frog occupancy and habitat use (Study 10.18)

Wood frog occupancy and habitat use, Study plan Section 10.18, Study Completion Report.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

ABR, Inc.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Succeeded by (expression): Wood frog occupancy and habitat use, Study plan Section 10.18, Study Completion Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03566cam a2200505Ia 4500
001 2955032
003 SIRSI
005 20170301174656.0
007 ta
007 cr cn||a||||||
008 170125s2015 akuabd bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)969993163 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 289 sec. 10.18 
088 |a SuWa 289 
245 0 0 |a Wood frog occupancy and habitat use, Study plan Section 10.18, Study Completion Report /  |c prepared by ABR, Inc.-Environmental Research & Services, [Offices in] Forest Grove, Oregon and Fairbanks, Alaska. 
246 1 7 |a Study Completion Report.  |p Wood frog occupancy and habitat use (Study 10.18) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2015] 
300 |a 40, 5, 8 pages :  |b 11 color illustrations, 4 color maps, 3 charts (1 col.) ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a "October 2015." 
513 |a November 2015; Study Completion and 2014/2015 Implementation Reports. 
500 |a ARLIS assigned report number: SuWa 289. 
510 3 |a Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports. 
580 |a Preceded by: Wood frog occupancy and habitat use study, Study plan Section 10.18, Initial Study Report / prepared by ABR, Inc.-Environmental Research and Services. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223). 
530 |a Available also in electronic format on the Internet. 
520 |a A study is being conducted on wood frogs in the Susitna-Watana Hydroelectric Project area with a focus on assessment of potential effects on them from development of the proposed Project and ways to mitigate those effects. The study includes water bodies and wetlands in the proposed Project area and encompasses the reservoir impoundment zone; dam and powerhouse facilities; access routes (Gold Creek corridor, Chulitna corridor, and Denali corridor (the proposed road linking the dam to the Denali Highway)); and material sites. This document is a comprehensive discussion of the methods and results of the study since the beginning of the study program in 2013 and through 2014, and represents the completion report. 
504 |a Includes bibliographical references (pages 21-23). 
650 0 |a Wood frog  |z Alaska  |z Susitna River Region. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a ABR, Inc.  |e author. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
730 0 |i Succeeded by (expression):  |a Wood frog occupancy and habitat use, Study plan Section 10.18, Study Completion Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289sec10-18.pdf  |3 Link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289.html  |3 List of related "Study Completion Reports" and "2014-2015 Study Implementation reports" published in October and November 2015 and May 2016.  |z ARLIS Document Server 
098 |a SuWa 00289 
901 |a ARLIS  |c orig 201701 
596 |a 9 10